
- 1 -
English
SUMMAry
1
General infOrmatiOn
1.1. PUrPoSE of ThE MANUAL ....................... 3
1.2. MANUfACTUrEr AND MAChINE
IDENTIfICATIoN .......................................... 4
1.3. TErMS AND DEfINITIoNS .......................... 5
1.4. MoDES of rEqUESTINg for
ASSISTANCE ................................................ 6
1.5. ATTAChED DoCUMENTATIoN ................... 6
2
Safety infOrmatiOn
2.1. gENErAL SAfETy PrECAUTIoNS ........... 7
2.2. SAfETy wArNINgS for
hANDLINg AND INSTALLATIoN ................. 8
2.3. SAfETy wArNINgS for USE AND
oPErATIoN ............................................... 10
2.4. SAfETy wArNINgS rELATED To
INCorrECT USE ........................................11
2.5. SAfETy wArNINgS
oN rESIDUAL rISkS ................................ 13
2.6. SAfETy wArNINgS for rEgULATIoNS
AND MAINTENANCE .................................. 14
2.7. INforMATIoN AND SAfETy SIgNALS ... 15
2.8. SUrroUNDINg ArEAS ............................ 16
3
technical infOrmatiOn
3.1. MAChIN
E gENE
rAL DESCrIPTIoN ........ 17
3.2. DESCrIPTIoN of ThE oPErATIoN CyCLE
20
3.3. SAfETy DEvICE DESCrIPTIoNS ............ 22
3.4. DESCrIPTIoN of ACCESSorIES oN
rEqUEST ................................................... 23
3.5. TEChNICAL SPECIfICATIoNS ................. 24
3.6. NoISE LEvEL ............................................. 26
3.7. INSTALLATIoN ENvIroNMENT
ChArACTErISTICS .................................. 26
4
infOrmatiOn On handlinG and
inStallatiOn OperatiOnS
4.1. rECoMMENDATIoNS for
hANDLINg AND LoADINg ........................ 27
4.2. PACkAgINg AND UNPACkINg ................. 27
4.3. TrANSPorT AND hANDLINg .................. 28
4.4. MAChINE INSTALLATIoN .......................... 29
4.5. INSTALLATIoN of roLLEr CoNvEyor 31
4.6. rECoMMENDATIoNS
for CoNNECTIoNS ................................. 31
4.7. PNEUMATIC CoNNECTIoNS .................... 32
5
infOrmatiOn On adjuStmentS
5.1. rECoMMENDATIoNS
for ADjUSTMENTS ................................. 33
5.2. EjECTor STokE ADjUSTMENT.............. 34
5.3. ADjUSTINg ThE ChAIN for MovINg
ThE fLAP-CLoSINg ShEETS .................. 35
6
aBOut the uSe
6.1. rECoMMENDATIoNS for oPErATIoN
AND USE .................................................... 36
6.2. DESCrIPTIoN DEvICES AND
PNEUMATIC CoNTroLS .......................... 37
6.3. SwITChINg ThE MAChINE
oN AND off .............................................. 38
6.4. EMErgENCy SToP AND rESTArT ......... 38
7
maintenance infOrmatiOn
7.1. MAINTENANCE INSTrUCTIoNS .............. 39
7.2. MAINTENANCE PErIoD TAbLE ............... 40
7.3. LUbrICATIoN PoINT DIAgrAM ............... 41
7.4. LUbrICANTS TAbLE ................................. 42
7.5. CoNDENSATE DISChArgE ..................... 43
7.6. CLEANINg ThE AIr fILTEr ...................... 43
8
trOuBleShOOtinG
8.1. TroUbLES – CAUSES – rEMEDIES ....... 44
9
Spare partS replacement
infOrmatiOn
9.1. rECoMMENDATIoNS
for rEPLACINg PArTS .......................... 45
9.2. rEPLACINg ThE ChAIN for MovINg
ThE fLAP-CLoSINg ShEETS .................. 46
9.3. LIST of ThE rECoMMENDED
SPArE PArTS ............................................ 47
9.4. MAChINE DISPoSAL AND SCrAPINg ..... 47
10 enclOSed dOcumentatiOn
10.1. wArrANTy CoNDITIoNS ........................ 48
10.2. PNEUMATIC SySTEM ................................ 49
Содержание ROBOPAC STARBOX 50
Страница 2: ......
Страница 4: ......
Страница 6: ... 2 2 English English Page deliberately empty Summary ...
Страница 53: ... 49 English Chapter 10 Enclosed documentation 10 2 Pneumatic system ...