- 32 -
- 32 -
6
bar
C
B
A
English
English
Chapter 4
INforMATIoN oN hANDLINg AND INSTALLATIoN oPErATIoNS
– Insert a flexible tube on the end
of the rubber fitting and fasten it
with a metallic screw clamp
(a)
.
– Check that the valve
(B)
is in the
“OPEN” position.
– Turn on the power supply line.
– Check that the pressure gauge
indicates
6 bar
and use the knob
(c)
to compensate any pressure
differences. repeat this operation
when the machine is running.
4.7.
pneumatic cOnnectiOnS
Proceed as indicated.
Содержание ROBOPAC STARBOX 50
Страница 2: ......
Страница 4: ......
Страница 6: ... 2 2 English English Page deliberately empty Summary ...
Страница 53: ... 49 English Chapter 10 Enclosed documentation 10 2 Pneumatic system ...