Chapter 5 The AP340 Platform
58
Aerohive
6. Insert the hanger clip upward through the center slot in the hanger frame, and then twist it
counterclockwise until the clip snaps into a locked position against the sides of the crossbar (see
Figure 10 Securing the AP340 to the hanger frame
7. Connect one or two Ethernet cables to the network, and—if not using PoE—connect the power cord to
a power source.
8. Replace the ceiling tile to complete the installation.
(Bird’s eye view with the ceiling
tiles and ceiling tracks removed
for clarity)
AP attached to the mounting plate
6
Insert the hanger clip up through
the center slot in the hanger
frame.
Rotate the AP and the attached
mounting plate counterclockwise
until the clip locks in place
against the sides of the crossbar.
Hanger frame
Hanger frame
Содержание BR200-WP
Страница 1: ...Aerohive Hardware Reference Guide...
Страница 2: ......
Страница 10: ...Contents 8 Aerohive...
Страница 28: ...Chapter 2 AP121 and AP141 Platforms 26 Aerohive...
Страница 42: ...Chapter 3 The AP170 Platform 40 Aerohive...
Страница 74: ...Chapter 6 AP330 and AP350 Platforms 72 Aerohive...
Страница 98: ...Chapter 9 BR200 and BR200 WP Routers 96 Aerohive...
Страница 110: ...Chapter 11 The HiveManager Platform 108 Aerohive...
Страница 124: ...Index 122 Aerohive...