TF7039GB_A_NOT
Page 25 of 48
To compensate for slight unevenness, the device has height- and
angle-adjustable feet. The unit is approved exclusively for instal-
lation on flat roofs. If it is not possible to adjust the feet sufficiently
to ensure horizontal alignment, further measures must be
checked by the customer.
Height adjustment of the foot
▪
Loosen the lowest nut.
▪
Turn the foot clockwise to lift the unit, counter-clockwise to lower the unit.
▪
Tighten the lowest nut.
Angle adjustment of the foot
▪
Loosen the two cap nut screws at the angle adjustment.
▪
Set the required angle.
▪
Tighten the two cap nut screws at the angle adjustment.
CONDENSATE DRAIN CONNECTION
The unit condensate drain must be connected in such a way that the condensate is drained off appropriately.
Ensure that a continuous outflow is guaranteed at all times. The drain must be protected against freezing by
suitable insulation and trace heating in the event of frost.
Free drainage of the condensate must be ensured at all times.
Draining the condensate onto the open-air roof surface can lead to smooth surfaces in frosty con-
ditions and thus endanger people.
PROTECTIVE EQUIPOTENTIAL BONDING
The protective equipotential bonding must be applied at the designated point under the terminal cover. En-
sure that the M6 nut with lock washer is seated firmly. The connection must be carried out professionally and
in accordance with standards in compliance with the national legislation in force in the country of destination.
The unit may only be installed on buildings up to a max-
imum height of 60 m (for Eco+ 111 and Eco+ 121) & 50m
for Eco+ 131 and only in wind zones 1-3 (DIN EN 1991-
1-4:2005).
Do not lift the unit so far that the threaded rod is standing
back in the threaded hole of the stand. The marked free
length must not exceed 50 mm.
max.
50 mm