TF7039GB_A_NOT
Page 24 of 48
HANDLING THE UNIT
The unit is bolted to a pallet for transport. With suitable transport equipment, the unit can be transported on
this pallet for all logistical processes except lifting onto the roof.
Free lifting of the unit (e.g. when lifting to the roof) may only be carried out using the eye bolts provided on
the top of the unit. The screw connection with the pallet must first be loosened and the plate removed.
The
rest of the packaging and the safety devices provided must only be removed after the lifting proce-
dure has been completed.
The unit must always be handled with professional care and without jerky movements. Before lifting, check
the weight on the technical type plate. In accordance with the regulations, suitable hoists of the same length
and spacers must be used.
Anchor points
The unit has four anchor points under its hood. There are four openings in the unit hood
for this purpose, in each of which an eyebolt is already mounted on delivery.
Eyebolt
All four eyebolts must be used to lift the unit.
Ensure the eyebolts are seated firmly before loading.
Cover
After finishing handling, unscrew the eyebolts and close the remaining openings with
the supplied covers. If you need to move the unit again, keep the eyebolts in a safe
place.
All parts of the unit must be secured against loss during lifting. It is strictly forbidden to stay be-
low the elevated unit.
The suitability of the planned installation site must be checked in advance.
The units must NOT be stacked.
ALIGNING THE UNIT
After installation, the device must be aligned at the intended destination to ensure proper functioning. For this
purpose, after removing the two service panels, use a spirit level or comparable means to check the horizontal
alignment.