MODULEX EXT 321, 481, 641, 802, 962, 1123 BOILERS
Installation, Operation & Maintenance Manual
Page
28
of
146
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0087_0F
07/13/15
Phone: 800-526-0288
GF-143
3.5 Removal From Boiler Bed And Installation Of Boiler Feet
Follow the directions below to prepare the boiler for installation:
1) Remove the covers of the boiler (Figure 3-4).
2) Lift the boiler with a hoist or forklift bands (Figure 3-4).
3) Remove the 4 screws ’’A’’ (Figure 3-4).
Figure 3-4: EXT Unpacking (Left = With Covers, Right = Lifted Without Covers)
4) Retrieve the four (4) support feet from one of the cardboard boxes packaged with the
boiler.
5) Attach the four (4) support feet to the chassis using the four ’’A’’ screws removed in Step
3 (Figure 3-5).
6) Place the boiler on concrete slab and re-mount the cover(s) over the boiler.
Covers
(Remove)