MODULEX EXT 321, 481, 641, 802, 962, 1123 BOILERS
Installation, Operation & Maintenance Manual
OMM-0087_0F
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
109
of
146
GF-143
Phone: 800-526-0288
07/13/15
Table 5-6: EXPERT Menu - Continued
LEVEL
DESCRIPTION
ENTRY
INSTALLATION (Cont.)
DEFAULT
RANGE
IMODULAT MAX
If this modulation degree is exceeded, the next
heat .....
35
(10 - 60)
MODULAT MIN
If values drop this modulation degree, the last heat
35
(10 - 60)
MIN MOD HS
Connection of the next heat generator
35
(0 - 60)
MOD LEVEL HW
Entry of the set modulation degree for the heat
generators
80
(40 - 100)
SEQUENCE 1
Boiler sequence 1
12345678
SEQUENCE 2
Boiler sequence 2
87654321
SEQU CHANGE
Sequence change mode
06
(01 - 06)
SEQ SW TIME
Time to sequence change
200
(10 - 800)
LOCK TIME
Min. delay time after switching on or with switching
HS
01
(00 - 30)
HYST BURNER2
Solid fuel integration: hysteresys for the charging
pump
4
(3.6 – 36)Ra
HS COOL-FCT
Not used
0
(0 - 1)
T-HS COOL
Not used
176
(122 - 203)
HEATSOURCE 1
Primary heat generator type
06
(00 - 06)
HS 1 BUS
Connections for HS
02
(00 - 04)
HEATSOURCE 2
Secondary heat generator type
0
(00 - 05)
STORAGE HS 2
Heat accumulator for HS2
0
(00 - 03)
BUFFER
Heater buffer storage tank
0
(00 - 03)
SCREED
Activation of screed drying process
0
(00 - 01)
SCREED PROGR Program setting
RETURN
HOT-WATER
DHW RELIEF
The charging pump is not switched until.....
0
(00 - 01)
PARALLEL
Pump parallel running
0
(00 - 03)
T-BOILER DHW
Boiler temperature setting with hot water
preparation
36
(00 - 90) Ra
HYST DHW
Hot water hysteresys
5
(9 - 54) Ra
DHW FOLLOWUP Pump run-down time
0
(00 - 30)
THER INPUT
Storage tank with thermostat
0
(00 - 01)
WALL HUNG
Boiler temperature setting with hot water
preparation
0
(00 - 01)
LOAD THROUGH The charge through function can be activated by...
0
(00 - 01)
RETURN