40
Figure 8-5 Piping the water heater
1 = Water heater
2 = Manual gas shut-off valve (Install manual gas shut-off
valve 5 ft (1.5m) above floor)
3 = Water heater Pump (Local pump)
4 = Filter
5 = Ball valve
6 = Built in storage tank
7 = Expansion tank
8 = Mixing valve
9 = Temperature gauge
10 = Check valve
11 = Recycling pump (If needed)
12 = Drain
8 - INSTALLATION - AGUADENS water connections
CAUTION!!!
This is a concept drawing
only. It is up to the system designer to
determine the necessary components,
including additional equipment
and any safety devices which in
the judgement of the designer are
appropriate, in order to properly size,
configure and design that system and
to ensure compliance with building
and safety code requirements.
Gas Inlet
Hot W
ater
Supply
Cold W
ater
Inlet
Recycling
Loop
Содержание Esteem 399
Страница 3: ...3 SAFETY INSTRUCTIONS ...
Страница 5: ...5 SAFETY INSTRUCTIONS ...
Страница 112: ...112 17 MAINTENANCE ...
Страница 116: ...116 19 SPARE PARTS Spare parts ...
Страница 135: ......