Benchmark 2500 - 3000 Boilers
CHAPTER 2 – INSTALLATION
OMM-0094_0E
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
17
of
204
GF-137
Ph.: 800-526-0288
03/20/2014
KEEP THE UNIT AREA CLEAR AND FREE FROM ALL COMBUSTIBLE
MATERIALS AND FLAMMABLE VAPORS OR LIQUIDS
.
While packaged in the shipping container, the unit must be moved by pallet
jack or forklift from the FRONT ONLY.
FOR MASSACHUSSETTS ONLY:
For Massachusetts installations, the unit must be installed by a plumber or
gas-fitter licensed within the Commonwealth of Massachusetts. In addition,
the installation must comply with all requirements specified in Chapter 1
Safety Precautions.
2.4.2 Setting the Unit
The unit must be installed on a concrete housekeeping pad, a minimum of 4 inches and a
maximum of 8 inches thick, to ensure proper condensate drainage. If anchoring the unit, refer to
Figure 2-1b for anchor locations.
Figure 2-1b: Benchmark 2500/3000 Anchor Bolt Locations
A total of 3 lifting lugs are provided at the top of the primary heat exchanger as shown in Figure
2-2. Remove the front top panel from the unit to provide access to the lifting tabs.
WARNING
CAUTION