![Aerco Benchmark BMK 2500 Скачать руководство пользователя страница 53](http://html.mh-extra.com/html/aerco/benchmark-bmk-2500/benchmark-bmk-2500_user-manual_2861524053.webp)
Benchmark 2500 - 3000 Boilers
CHAPTER 4 – INITIAL START-UP
OMM-0094_0E
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
53
of
204
GF-137
Ph.: 800-526-0288
03/20/2014
Figure 4-1b:
BMK 3000:
1/4 Inch Gas Plug Location for Combustion Calibration
Install the 16” W.C. manometer(s) as described in the following steps:
Installing Gas Supply Manometer
1.
Turn off the main gas supply upstream of the unit.
2.
Remove the top panel and front panel from the boiler to access the gas train components.
3.
To monitor the gas pressure on the downstream side of the SSOV during Combustion
Calibration (section 4.3), remove the 1/4” NPT plug from the leak detection ball valve on the
downstream side of the SSOV as shown in Figure 4-1a or 4-1b, depending on the model
being calibrated.
4.
Install a NPT-to-barbed fitting into the tapped plug port.
5.
Attach one end of the plastic tubing to the barbed fitting and the other end to the 16” W.C.
manometer.
NATURAL
GAS INLET
SSOV
TO
AIR/FUEL
VALVE
LEAK DETECTION
BALL VALVE
1/4” NPT PLUG
(Install manometer
here for Combustion
Calibration)
HIGH GAS
PRESSURE
SWITCH
LOW GAS
PRESSURE
SWITCH
MANUAL
SHUT-OFF
VALVE