Temperature Control Units : Sentra with VE Series Instrument
Page: 42
Advantage Engineering, Inc.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
www.AdvantageEngineering.com
11.
Replace the 4 heater mounting bolts. Alternate to the opposite bolt while
tightening.
12.
Reconnect the power cable to the heater terminals. Be certain to tighten the
power cord junction box connector. Replace the junction box cover and the lift-off
cover panel.
E.
When complete, restart the unit.
Содержание Sentra SK Series
Страница 2: ......
Страница 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Страница 20: ...Page 20 THIS PAGE INTENTIONALLY BLANK ...
Страница 30: ...Page 30 THIS PAGE INTENTIONALLY BLANK ...
Страница 36: ...Page 36 THIS PAGE INTENTIONALLY BLANK ...
Страница 68: ...Page 68 THIS PAGE INTENTIONALLY BLANK ...
Страница 69: ...END 2017 ADVANTAGE ENGINEERING INC RE 01272017 ...
Страница 70: ......