BC-N4 Glycol Chiller
Page: 26
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: [email protected]
bypass system in the process circuitry. This will allow a portion of the
flow to bypass the process and return directly to the chiller. This keeps
the total flow above the cutoff point. The figure on the previous page
illustrates a typical bypass loop.
c.
Some models may have a factory installed bypass. Follow the instruction
in paragraph “d” below to adjust the low flow bypass.
d.
Adjusting the Low Flow Bypass:
For Manual Low Flow Bypass Valves: Start with the bypass completely
closed and gradually open the valve until the low refrigerant pressure
gauge reading is in the normal operating range for the refrigerant type
used in the chiller.
For Automatic Low Flow Bypass Valves: A “T” handle or adjusting
stem is located on the top of the valve. Turning the “T” handle or
adjusting stem in the clockwise direction puts more pressure on
the valve’s spring reducing bypass flow. Turning the “T” handle or
adjusting stem counter clockwise puts less pressure on the spring and
increases bypass flow. Adjust the “T” handle or adjusting stem until the
low pressure gauge reading is in the normal operating range for the
refrigerant type used in the chiller. If the low pressure gauge reading
is below normal, reduce the pressure on the spring to provide more
bypass.
4.
HIGH FLOW: If a high flow condition is present:
a.
High flow can cause premature component wear and poor operating
conditions.
b.
Adjust the flow so that an 8°F - 10°F rise in water temperature is
indicated while the system is fully loaded.
Automatic Low Flow
Bypass Valve
Содержание BC-N4 Series
Страница 2: ......
Страница 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Страница 20: ...Page 20 THIS PAGE INTENTIONALLY BLANK ...
Страница 32: ...Page 32 THIS PAGE INTENTIONALLY BLANK ...
Страница 48: ...Page 48 THIS PAGE INTENTIONALLY BLANK ...
Страница 54: ...Page 54 THIS PAGE INTENTIONALLY BLANK ...
Страница 62: ...Page 62 THIS PAGE INTENTIONALLY BLANK ...
Страница 63: ...END 2016 ADVANTAGE ENGINEERING INC RE 09 27 2016 ...
Страница 64: ......