[Sentry Trailer – Operation, Startup, and Shutdown Procedures]
5.
IMPORTANT!
Check winch cable and make sure the cable is properly seated on each pulley
sheave.
a. Using the winch, apply tension to the winch cable
BEFORE
tilting to the vertical position.
This will keep the cable properly seated on the sheave and keep the pulleys from being
damaged.
Erecting the Tower at Full Height
1. While the tower is still in the horizontal position, loosen and remove the hold down restraining
cables that hold the tower in place for transporting. These cables are located on the front
support of the trailer and/or shelter (see Fig. 7).
7