background image

             [Sentry Trailer – Operation, Startup, and Shutdown Procedures]

8. 4B

9. 4S

10. A1

13

Содержание Sentry

Страница 1: ...torm or when lightning is a possibility Never climb the tower for any reason Always lower the tower completely and access it with a suitable ladder or platform Never overextend the tower height When at maximum height the orange rung on the second tower section from the bottom rests on the orange safety stop at the top of the base tower section Always tow the trailer in a level position to meet hei...

Страница 2: ... outrigger jacks in place Remove them and stow on rear frame or in a storage box Before transporting the trailer tower make sure that the tower hold down cable and the Red Strap at the rear bottom end of the tower are in place and secure When transporting trailer and tower drive within the speed limits and do not exceed 55MPH Always following basic ladder safety guidelines when using the trailer t...

Страница 3: ...gs cannot support the weight of a person ALWAYS tow the trailer in a level position to meet height restrictions Adjust coupler height as needed ALWAYS make sure your tow vehicle and hitch capacity are suitable for the trailer you are towing These items must be rated according to the GVWR on the V I N decal on the front of your trailer tower unit NEVER overload your trailer or the tongue of your tr...

Страница 4: ...p and Running to see that they are functioning properly If using electric brakes check to see that they are properly connected and that the brake controller is in proper working order 4 Next hook up the small wire cable that operates the breakaway brake control see Fig 3 Positioning the Trailer Tower 1 Position the unit in a place that will allow the following radius around the tower 70 foot radiu...

Страница 5: ...cle can be moved away see Fig 1A OR pull the pin on the dropleg jack and allow the leg to drop to its lowest position b Realign the through holes and reinsert the pin Crank it down so the tow vehicle can be moved away see Fig 1B c Disconnect the safety chains light connector cable and breakaway cable from the tow vehicle 4 Remove the two hitch pins that hold the rear outriggers in the stowed posit...

Страница 6: ... plate mast adaptor b Slide the mast into the lower plate mast adaptor until it is fully seated against plate c Turn the mast to align the bolt thru holes d Reinsert the bolts and fully tighten the nuts 2 Feed the coax cable through the middle of the smallest section and up through the mast at the top of the tower 3 Mount the antenna to the mast per the manufacturer s specifications and connect th...

Страница 7: ...EFORE tilting to the vertical position This will keep the cable properly seated on the sheave and keep the pulleys from being damaged Erecting the Tower at Full Height 1 While the tower is still in the horizontal position loosen and remove the hold down restraining cables that hold the tower in place for transporting These cables are located on the front support of the trailer and or shelter see F...

Страница 8: ...e applied to the cable to overcome internal resistance and operate brake properly NEVER CONTINUE TURNING THE HANDLE COUNTER CLOCKWISE IF THE CABLE DOES NOT KEEP MOVING OUT This will disengage the brake mechanism and create an unsafe or hazardous condition MINIMUM OPERATING LOAD REQUIREMENTS MODEL 5351 75 lbs Failure to read and apply the instructions and warnings contained in this manual can resul...

Страница 9: ... properly before raising the tower CAUTION Do not attempt to raise tower in winds over 10 mph Even in winds between calm and 10 mph there MUST BE a person at each of the guy wires to ensure that the wires are kept taut 6 Raise the tower to the desired height The safety stop engages at a rung approximately every 20 inches Remember that the electric winch is capable of damaging the tower so be alert...

Страница 10: ...afety stop is controlled by an orange cord attached to one leg of the tower b After the tower has been cranked up slightly pull the orange cord until the safety stop clears the rung above it c Start lowering the tower while keeping tension on the orange cord The safety stop must be kept out of the way for the complete lowering of the tower 2 After the tower has been lowered to the retracted positi...

Страница 11: ... the head with a post hole digger or shovel and then pulling back on the eye towards the hole 7 Raise the front leveling jacks until the weight is on the tongue jack a Remove the front leveling jacks and stow them in the storage box 8 Remove the rear outrigger leveling jacks and stow them in the storage box Remove the hitch pins from the outriggers and slide them into their stowed position and rei...

Страница 12: ...in the white battery box located at the rear of the trailer Power on the circuit breakers from top to bottom in the following order 1 A1 2 4S 3 4B 4 5B 5 6B 6 5S 7 6S 8 7S 9 1B 10 2B Shutdown Procedure Turn off the circuit breakers from bottom to top in the reverse order of the startup procedure 1 2B 2 1B 3 7S 4 6S 5 5S 6 6B 7 5B 12 ...

Страница 13: ... Sentry Trailer Operation Startup and Shutdown Procedures 8 4B 9 4S 10 A1 13 ...

Отзывы: