Supplying Power to the Timeclock and Verifying Operation
Series 4000 Badge Timeclock Installation Guide
2-23
3. If you installed the battery, connect the charger board to the main board.
Number
Description
1
Battery charger board cable that connects to the main board
2
Charger board connection to the main board
Содержание Series 4000
Страница 4: ......
Страница 8: ...Checklist of Installation and Configuration Tasks viii ADP Inc ...
Страница 16: ...Chapter 1 Before You Install the Series 4000 Timeclock 1 8 ADP Inc ...
Страница 56: ...Chapter 4 Troubleshooting Hardware and Operational Problems 4 4 ADP Inc ...
Страница 62: ...Appendix A Replacing a Series 400 Timeclock with a Series 4000 Timeclock A 6 ADP Inc ...