Supplying Power to the Timeclock and Verifying Operation
Series 4000 Badge Timeclock Installation Guide
2-25
Verifying Operation of the Timeclock
When you supply power to the timeclock, it initializes itself, performs internal
diagnostics, and starts the operating system and timeclock application. This
process takes approximately one minute.
If the initialization completes successfully, the Communications Setting screen
appears. Go to page 2-26, then to Chapter 3, “Performing Local Configuration.”
If the Communication Setting screen does not appear, the timeclock did not
initialize successfully. Contact your TLM Representative.
Device ID
Changing comm settings causes a reboot!
Gateway
IP Address
Subnet Mask
Содержание Series 4000
Страница 4: ......
Страница 8: ...Checklist of Installation and Configuration Tasks viii ADP Inc ...
Страница 16: ...Chapter 1 Before You Install the Series 4000 Timeclock 1 8 ADP Inc ...
Страница 56: ...Chapter 4 Troubleshooting Hardware and Operational Problems 4 4 ADP Inc ...
Страница 62: ...Appendix A Replacing a Series 400 Timeclock with a Series 4000 Timeclock A 6 ADP Inc ...