
10
•
Installations
2
Installations
This chapter provides information on how to use the jumpers and
connectors on the NuPRO-598 in order to set up a workable system. The
topics covered are:
♦
CPU Installation
♦
Memory Installation
♦
Jumpers on the NuPRO-598
♦
Connectors on the NuPRO-598
♦
Watchdog timer configration
Содержание NuPRO-598 Series
Страница 2: ......
Страница 6: ......
Страница 8: ...ii Table of Contents Product Warranty Service 82...
Страница 16: ...8 Introduction Figure 1 Layout of key components JP4...
Страница 17: ...Introduction 9 Figure 2 NuPRO 598 Mechanical Drawing...
Страница 20: ...12 Installations Figure3 Jumper Locations on the NuPRO 598 JP4 JP13...
Страница 24: ...16 Installations JP9 CPU Core voltage VCORE JP9 1 9V 2 0V 2 1V 2 2V...
Страница 25: ...Installations 17 VCORE JP9 2 3V 2 4V 2 8V JP4 JP5 CPU VI O JP4 JP5 Voltage 1 3 1 3 2 5V 1 3 1 3 3 3V...
Страница 27: ...Installations 19 Figure 4 Connector Locations on the NuPRO 598 JP4...