![Adam Equipment GK Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/adam-equipment/gk/gk_user-manual_2846151010.webp)
8 © Adam Equipment Company 2011
5.
CONNECTION
This indicator must be connected to a load cell platform and calibrated as necessary
to match the platform and user requirements.
The GK has a connector configured for a 6 wire load cell. Connect the load
cells/platform to the indicator as shown below. The cable length should be as short
as possible, using a large size wire to minimise errors due to resistance in the leads.
GK-M model must use the 6 wire connection and has certain limitations for wire size
and length. Refer to the Approval Test Certificate for details.
Содержание GK
Страница 6: ... Adam Equipment Company 2011 4 ...
Страница 8: ... Adam Equipment Company 2011 6 ...
Страница 64: ...62 Adam Equipment Company 2011 ...