![ActronAir HERCULES PKV1400T Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/actronair/hercules-pkv1400t/hercules-pkv1400t_installation-and-commissioning-manual_2844104043.webp)
Installation and Commissioning Guide
Hercules Package Unit
43
Installation and Commissioning Guide - Hercules Package Unit
Doc. No.0525-021
Ver. 21 221110
18.02. Consumer / End User Menu
NOTES:
To toggle (scroll)
Up
or
Down
from existing menu,
press
or
button.
Available when enabled via Clock / Scheduler
D1
.
Available when enabled via Service Menu.
1
2
LEGEND:
E- B
F-B
S1 Probe Evap Press / Temp
E33
Defrost Count:
E27
Compressor 1 / Compressor 2
S3 Probe Evap Press / Temp
E36
S2 Probe Suction Temp
E34
S4 Probe Suction Temp
E38
Power Information:
E26
Total Power /Supply Fans
Compressor 1/Cond 1 Fans
Compressor 2/Cond 2 Fans
2
Serial Probe No. 2
E40
Temperature / Humidity / Dew Point
2
Serial Probe No. 1
E41
Temperature / Humidity / Dew Point
Probe Status
E39
S1 / S2 / S3 / S4
Damper Status
E28
Min. Outside Position (Int/CO2/BMS)
Economy Output
Damper Command
Valve A
E30
Status / Opening / Position
Cool. Capacity / Superheat
Valve B
E32
Status / Opening / Position
Cool. Capacity / Superheat
VSD 1 Status / Run
E20-E22
Alarms / Speed Status
Request / Feedback
Dissip. temp. / DC voltage
Motor data:
Speed / Voltage / Current
VSD 2 Status / Run
E23-E25
Alarms / Speed Status
Request / Feedback
Dissip. temp. / DC voltage
Motor data:
Speed / Voltage / Current
Comp 1 and 2 Restriction
E42-E43
Dec/Inc/Hold/Cap/Force
Comp Targets
E44
Capacity Demand
Comp 1 /Comp 2 Target
Log 1 - Recent Alarm
Log 3 - Recent Alarm
Log 100 - Recent Alarm
Reset Alarm Log : Yes / No
F1
Up To
Log 2 - Recent Alarm
F. Alarm History
To
G. Service Menu
Содержание HERCULES PKV1400T
Страница 83: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK...