20
Installation and Commissioning Guide
Hercules Package Unit
Installation and Commissioning Guide - Hercules Package Unit
Doc. No.0525-021
Ver. 21 221110
08.02. Forklift Method
UNIT FORK LIFTING HOLE DIMENSIONS
(All dimensions in mm).
280
280
90
1320
COMPRESSOR
END
PACKAGE
UNIT
CAUTION
DO NOT LIFT UNIT at this end
.
INSER
T FORKLIF
T
TINE
S HERE
Procedure:
1. To move the unit around with a forklift, insert the fork tines through the pallet, as shown.
2. Only fork the unit through side of the unit. (See illustration for location of compressor end)
CAUTION
Length of forklift tines must pass the total width of the unit, in order to safely carry the unit. Make sure that the forklift
tines do not cause any damage to the unit.
DANGER
Make sure rigging equipment, accessories and plant are sufficiently and safely capable to lift the unit in order to prevent
potential damage to property, severe personal injury or death. Please check unit weight and weight distribution points as
shown in the unit drawing dimensions section.
Содержание HERCULES PKV1400T
Страница 83: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK...