3 System upgrade
72
5
Press the holding clips inward to lock the VRM in place
(C)
.
6
Reinstall the CPU air baffle. See “Installing the CPU air baffle” on
page 43.
7
Observe the post-installation instructions described on page 38.
Removing the processor core VRM
Note:
The two processor core VRMs are located under the center
brace.
1
Observe the ESD precautions and pre-installation instructions
described on page 37.
2
Remove the memory boards or memory air baffles from DIMM
slots C and D. See “Cold Removal of Memory Board” on page 75
and “Removing a memory board air baffle” on page 46.
3
Remove the fourth processor core VRM.
Warning! The processor 4 VRM baffle must be installed to
maintain proper system airflow, even though you may not
have installed a VRM.
A
C
B
Содержание ALTOS R910 Series
Страница 1: ...Acer Altos R910 Series User s Guide ...
Страница 10: ...x ...
Страница 11: ...1 System tour ...
Страница 36: ...1 System tour 26 ...
Страница 37: ...2 System setup ...
Страница 45: ...3 System upgrade ...
Страница 111: ...4 BIOS setup ...
Страница 119: ...109 Error Manager Error Manager lets you view POST errors detected by the system ...
Страница 137: ...127 Video The Video submenu allows you to enable or disable the onboard video controller ...
Страница 138: ...4 BIOS setup 128 USB The USB submenu allows you to enable or disable the onboard USB controller ...
Страница 143: ...133 FRU Information The FRU Information submenu lets you view the field replaceable unit parameters ...
Страница 145: ...135 FRB Information The FRB Information submenu lets you examine and set the fault resilient boot options ...
Страница 150: ...4 BIOS setup 140 ...
Страница 151: ...5 Troubleshooting ...
Страница 164: ...5 Troubleshooting 154 ...
Страница 165: ...Appendix A Acer Altos R910 rack installation guide ...
Страница 166: ...This appendix shows you how to set up the Altos R910 server in a rack mount configuration ...
Страница 174: ...Appendix A Acer Altos R910 rack installation guide 164 6 Fully extend the mounting rails on the rack ...
Страница 178: ...Appendix A Acer Altos R910 rack installation guide 168 ...
Страница 179: ...Appendix B Memory configuration options ...
Страница 198: ...Appendix B Memory configuration options 188 ...
Страница 199: ...Appendix C RAID configuration utilities ...
Страница 200: ...This appendix gives an overview of the different RAID configuration utilities supported by your server ...
Страница 206: ...Appendix C RAID configuration utilities 196 ...
Страница 210: ...200 U upgrading the BIOS 139 ...