2 System tour
38
Note:
The cable carrier allows you to tie-wrap all cables to and
from the server. As you slide the server in and out of the rack, the
cable carrier collapses and extends, keeping the cables untangled
and attached to the server.
8
Attach the handle to the tray using two M5 metal screws.
9
Attach a component rail on each side of the tray with ten M4
metal screws.
AA G610.book Page 38 Monday, October 22, 2001 9:46 AM
Содержание Altos G610
Страница 1: ...Acer Altos G610 User s guide ...
Страница 10: ......
Страница 11: ...1 System overview ...
Страница 18: ...1 System overview 8 ...
Страница 19: ...2 System tour ...
Страница 51: ...41 e Place the server on the tray and secure it with the four screws removed from the stands ...
Страница 56: ...2 System tour 46 ...
Страница 57: ...3 Upgrading your system ...
Страница 90: ...3 Upgrading your system 80 ...
Страница 91: ...4 BIOS Setup utility ...
Страница 134: ...4 BIOS Setup utility 124 ...
Страница 135: ...Appendix A ASM Pro quick installation guide ...
Страница 136: ...This appendix shows you how to set up ASM Pro and its agent software ...
Страница 154: ...Appendix A ASM Pro quick installation guide 144 ...