CLEMENTS
CLEMENTS
CLEMENTS
CLEMENTS
19
Connect pump as shown in diagram. Set vacuum control knob
to maximum, and switch on pump. Occlude jar inlet and
confirm that pump achieves the same maximum vacuum as in
the previous vacuum check setup . Any difference indicates
leaks in jar or connections.
1. Occluded
-
leak check
Flow Check
Max
Vacuum
Gauge
Connect pump as shown in diagram. Set vacuum control knob
to maximum, and switch on pump. Connect jar inlet to
calibrated flow meter and note flow reading.
If flow is significantly below specification, check internal tubing
and pump itself (or internal shutoff valve if fitted).
2. Unoccluded
-
flow check
Max
Vacuum
Gauge
Collection
Jar
Calibrated
Flowmeter
Diagnostic Setup
Содержание SUC 81025
Страница 17: ...CLEMENTS CLEMENTS CLEMENTS CLEMENTS 17 Wiring Diagram Wiring Diagram ...
Страница 25: ...CLEMENTS CLEMENTS CLEMENTS CLEMENTS 25 Notes Notes ...
Страница 28: ......