168
(Side View)
5.3.4 Installation Method
PROFIBUS is linked to Acuvim II meter by communication plug. It can also be
linked to other extended modules such as IO modules.
1. Insert the installation clips to the counterpart of Acuvim II meter, and then
press the PROFIBUS module lightly, so linking is established.
2. Tighten the installation screws.
Note: 1. Install IO Modules carefully to avoid damage;
2. Under no circumstances should any installation be done with the meter
powered on. Failure to do so may result in injury or death.
22 mm
Shop for Power Metering products online at:
1.877.766.5412
www.
PowerMeterStore
.com
Содержание Acuvim II
Страница 2: ...Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 8: ...VI Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 16: ...8 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 55: ...47 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 60: ...52 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 85: ...77 Fig 4 7 basic settings Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 142: ...134 Fig 5 27 Fig 5 28 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 167: ...159 Fig 5 46 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...
Страница 268: ...260 Shop for Power Metering products online at 1 877 766 5412 www PowerMeterStore com...