• This TSP has a life of 10 years. This duration is based on a utilization of the platform according
to the instructions of this manual of 200 hours per year and with the condition that the annual reviews ef-
fect.
• A special care is needed by dangers that will appear when the TSP is over water, public areas or
where it’s not possible to get the platform down to a safe position.
• When planning the work, the climatic and wind characteristics of the site must be taken into ac
-
count: in case of doubt, check the weather and wind conditions in the meteorological service before start-
ing work.
• Don’t use the TSP in severe conditions such as atmospheric extreme conditions, corrosive en
-
vironments, magnetic fields, explosive atmospheres (ATEX), works under tension, works in low voltage
network, etc.
• A special care in needed due to dangers derived form work with TSP in confined spaces.
• In the vicinity of the winch it is necessary to use hearing protection.
• Don’t use the TSP for loads which can generate dangerous situations (for example: molten metal,
acids, radioactive materials, etc.)
• For platforms employed at heights upper than 40 m and exposed to winds over 50km / h, they
must limit the lateral movements by a guide system, composed by anchorages each 20m.
• A special care is needed by dangers that will appear when the loads are manipulated.
•
In some countries of the European Union is obligatory an inspection before the putting in
service of a new work. This control must be realized by an authorized organism.
•
To cover risks arising from misuse, it is necessary the use of personal protective equip-
ment (PPE) fall arrest by operators. See section 8.1 of this instructions manual.
•
The elaboration of the procedure for entering a confined space is the responsibility of the
company that uses the machine.
IMPORTANT:
If you entrust this equipment to subcon-
tracted personnel you have to apply and
check his obligations about safety at
work, specially for verifications and tests
before the putting in service.
RISK ASSESSMENT:
According to 92/57/CEE, each contractor
shall prepare a
Safety and Health
plan at
work which analyses, studies, develops and
supplements the previsions contained in the
study or basic study, based on their own sys-
tem of execution of the work.