Preparation work before installation
Please make sure that the sliding gate is correctly installed, the gate rail is horizontal, and the gate can be manually moved
smoothly before installing the gate opener.
Cable installation
In order to guarantee the normal operation of the gate opener and protect the cables from damages, please bury the motor
& power cable and controlling cable separately with two PVC tubes.
Concrete pedestal
Please precast a concrete pedestal with the size can be 400mm x 250mm, depth be 200mm in advance, so as to firmly install
PB400 gate opener. Please make sure the distance between the gate and gate opener is appropriate before casting the
pedestal.
Concrete
Power line
Mounting plate
Foundation bolt
Figure 2
Operator base
After the concrete has hardened, mount the door opener base to the concrete pad. Check that the base is level correctly.
Using the bolts, washers, mount the door motor to the base and insert the cover. Check the operator and make sure it is
aligned with the door.