
46
Installation Manual – RPSP
INS-RPSP-EN-05
2.
Adjust the upper stop point for the actuators leaving a
small gap of 2-3 mm, which should come about with
the sliding of the clutch on the linkage rod.
Fig. 64 – Clutch adjustment check
3.
Check the proper operation of the emergency safety
rail arm unlocking system on both sides (ascent and
descent) as follows:
3.1 Insert the pry bar supplied in the hole as
illustrated.
Fig. 65 – Clutch adjustment check
3.2 Unblock the linkage and at the same time raise
the safety rail arm until the upper position is
locked.
Fig. 66 – Clutch adjustment check
Warning!
In the event that the linkage does not achieve the upper locking position, adjust the upper
actuator stop points, increasing the stroke upwards.
3.3
Perform the inverse procedure to re-establish the normal operational configuration.
Содержание RPSP
Страница 1: ...Supra Linea Inclined Platform Lift Installation Manual INS RPSP EN 05 ...
Страница 6: ...5 Installation Manual RPSP INS RPSP EN 05 Fig 2 General exploded view ...
Страница 7: ...6 Installation Manual RPSP INS RPSP EN 05 Fig 3 Register exploded view ...
Страница 8: ...7 Installation Manual RPSP INS RPSP EN 05 Fig 4 View of the guide ...
Страница 9: ...8 Installation Manual RPSP INS RPSP EN 05 Fig 5 Machine body ...
Страница 11: ...10 Installation Manual RPSP INS RPSP EN 05 Fig 7 Platform Fig 8 Lateral Motorized Flap SML ...
Страница 12: ...11 Installation Manual RPSP INS RPSP EN 05 Fig 9 Frame crush proofing Fig 10 Anti impact ...
Страница 14: ...13 Installation Manual RPSP INS RPSP EN 05 Fig 12 Three phase electrical motor connections ...
Страница 57: ...56 Installation Manual RPSP INS RPSP EN 05 ...
Страница 58: ...57 Installation Manual RPSP INS RPSP EN 05 ...
Страница 60: ......