background image

Above

Air

 

MissionCritical

 A/C’s

AboveAir

 

Technologies

 (MC22-L12)

14

Guide Specifications

  Guide Specifications -

 

MC

-

2x2

 Mission

Critical

 (1-3 Tons)

be provided by a remote water source 

(by others)

.

The system shall require only single 

point main power supply and ship from 

the factory with a full operating refriger

-

ant charge.

(

Note:

  Higher pressure and 3-way valves are 

optionally available, see option 2.4.2.)

  2.3.3  DX - Glycol Cooled Systems

  2.3.3.1  DX - Glycol Cooled 

   

    (Self-Contained Systems)

    

  VCG-( )

 

  

      

    

The system shall be a self-contained, 

compact 24” x 24” maximum foot-print 

indoor vertical floor mounted dx glycol 

cooled precision air conditioner.  The 

system shall include a glycol cooled 

tube-in-tube coaxial condenser and fac

-

tory installed head pressure controlling 

2-way glycol regulating valve rated for 

150 psi w.w.p.  The condenser shall be 

designed to provide the total required 

system heat of rejection at 110°F enter

-

ing glycol temperature and 120°F leaving 

glycol temperature based on 40% ethyl

-

ene glycol solution.  Source glycol shall 

be provided by a remote glycol drycooler 

source 

(see AboveAir Technologies’ 

FluidCool™ drycoolers)

.

The system shall require only single 

point main power supply and shall ship 

from the factory with a full operating 

refrigerant charge.

(

Note:

  Higher pressure and 3-way valves are 

optionally available, see option 2.4.2.)

 

2.3.3.2  Glycol Pump Packages 

   

    & Drycoolers

 

 

 

  FC_-( ) / PA_-( )

       

Glycol condenser source shall be pro

-

vided by a FluidCool™ brand remote air 

cooled glycol drycooler and Pump-All™ 

brand pump package.
The glycol drycooler shall be the outdoor 

mounted propeller fan type complete 

with factory installed aquastat fan cycling 

controls, motor starters with overload 

protection and non-fused disconnect 

switch.
The glycol pump package shall be a 

(single or dual) pump package designed 

for outdoor installation complete with 

individual pump motor starters.  Dual 

glycol pump packages shall be provided 

with manual lead-lag switch and field in

-

stalled flow switch for automatic switcho

-

ver to backup pump upon loss of flow.

An expansion tank and air purge fitting 

valve shall be factory provided for field 

installation.
The drycooler shall provide __________ 

BTUH total heat rejection at a flow rate 

of _____ GPM with ____ °F EGT and 

____ °F  LGT at ____ °F ambient air tem

-

perature.  Each pump shall be ____ Hp 

and shall be sized to provide ____ GPM 

@ ____ Ft. w.g. total system head.  The 

glycol solution shall be ___ % (

ethylene

 

or 

propylene

) by volume.

The drycooler and pump package shall 

be designed for _____ Volt, ______ 

Phase, _____ Hertz main power supply.

(

Note:

  See AboveAir Technologies’ Fluid-

Cool™ indoor & outdoor glycol drycooler and 

PumpAll™ glycol pump packages engineering 

manuals for more information.)

  2.3.4  Chilled Water Systems

   

  VCC-( )

  

The system shall be a compact 24” x 

24” maximum foot-print indoor vertical 

floor mounted chilled water precision air 

conditioner.  
The chilled water cooling coil shall be 

constructed of copper tubes and alumi

-

num fins.  Coil end-plates shall be hot 

dipped galvanized.  The cooling coil shall 

be mounted in an insulated stainless 

steel condensate drain pan.
Chilled water flow shall be controlled 

by a factory installed 2-way (0-10Vdc) 

modulating control valve rated for a 

maximum 300 psig w.w.p.

(

Note:

  3-way and higher pressure valves are 

optionally available.)

2.4  Options

 

2.4.1    Air Cooled Condenser - 

   

    Low Ambient Control

 

2.4.1.1  0°F Ambient - 

   

    Fan Cycling 

  

       

(CCX, XP1 & XPU Models)

Fan cycling controls shall be factory 

installed to the direct drive condenser fan 

to allow for low ambient operation to 0°F.

 

2.4.1.2  -20°F Ambient - 

   

    Variable Speed Fan

  

      

(XCU, XP1 & XPU Models)

Variable fan speed head pressure 

controls (

JCI P266 or VFD66

) shall be 

factory installed to allow for low ambient 

operation to -20°F.  Compressor cold 

start time delay relay and crankcase 

heater shall be factory installed with the 

-20°F low ambient control feature.

 

2.4.1.3  -30°F Flooded 

      Condenser

      

(All Condensing/er Models)

A flooded condenser system shall be 

provided to allow for low ambient con

-

denser operation to -30°F.  The flooded 

system shall include a factory installed 

liquid refrigerant receiver and modulating 

head pressure control valve.  Compres

-

sor cold start time delay relay and crank

-

case heater shall be factory installed with 

the -30°F low ambient control feature.

 

2.4.2    DX - Water/Glycol 

   

    Cooled Reg. Valves

 

     

 

2.4.2.1    2-Way, 150 psig Reg. Valve

 

 

2.4.2.2    3-Way, 150 psig Reg. Valve

 

 

2.4.2.3    2-Way, 350 psig Reg. Valve

 

2.4.2.4    3-Way, 350 psig Reg. Valve

 

System head pressure shall be con

-

trolled by a factory provided 2-way water 

/ glycol regulating valve rated for 350 

psig w.w.p.

Содержание MissionCritical MC-2x2

Страница 1: ... Ton Capacities Precision Applications Computer Rooms Telecom Rooms Server Closets Compact Vertical Floor Mounted Upflow Downflow Configurations DX Air Water Glycol Cooled Chilled Water Systems Total Temp Humidity Control Steam Humidifier Reheat Heat via Electric Hot Gas Hot Water or Steam Microprocessor Controls More From 1 to 3 Tons MC 2x2 MissionCritical Vertical Floor Mounted A C s Single Circ...

Страница 2: ...s and accessories R410a Refrigerant Energy efficient operation Contents Introduction 2 Model Configurations 2 17 Features and Benefits 3 Performance Data 4 8 Electrical Data 9 11 Guide Specifications 12 16 Dimensional Data 18 21 Approximate Unit Weights lbs 23 VCH XPU DX Air Cooled Split with Propeller Fan Outdoor Remote Condensing Unit VCE XP1 DX Air Cooled Split with Propeller Fan Outdoor Remote...

Страница 3: ...mpressor Low Sound Direct Drive Centrifugal Blowers High Efficiency Air Filtration Low Ambient Head Pressure Control 2 3 way 150 psig or 350 psig Water Glycol Cooled Regulating Valves Hot Gas Bypass Top or Bottom Piping Connections Variety of Standard Optional Features Accessories 2 or 3 Way Plenum Discharge Boxes Floor Stands Turning Vanes Condensate Pumps Factory Installed Main Power Electrical ...

Страница 4: ...0 540 46 910 54 640 Flow Rate PD GPM FT 2 3 0 7 2 9 1 0 4 2 0 1 4 9 0 2 5 7 0 2 Standard Valve TXT 2 way field installed 3 way valves are optional Steam Canister Humidifier Standard Steam Canister LBS HR 5 5 5 5 5 Evaporator Blower Motor Direct Drive Backward Inclined Variable Speed EC Impeller Airflow Rate CFM 500 750 1 000 1 250 1 600 Motor KW KW 1 0 1 0 1 0 1 0 1 0 E S P IN WG 0 3 0 3 0 3 0 3 0...

Страница 5: ...D Propeller DD Propeller DD Propeller DD Propeller DD Propeller Coil Face Area FT2 8 4 8 4 9 8 13 13 17 25 Rows NO 1 1 1 1 1 Indoor Remote Centrifugal Blower Air Cooled Condenser Condensing Unit Data CCU XCU CCX XCX Models Remote Condensing Unit Model CCU 012 CCU 018 CCU 024 CCU 030 XCU 036 Remote Condenser Model CCX 012 CCX 018 CCX 024 CCX 030 XCX 036 Summer Amb Design F DB 95 95 95 95 95 Winter ...

Страница 6: ... LWT 70 F DB EAT Capacity BTUH 21 760 28 080 40 540 46 910 54 640 Flow Rate PD GPM FT 2 3 0 7 2 9 1 0 4 2 0 1 4 9 0 2 5 7 0 2 Standard Valve TXT 2 way field installed 3 way valves are optional Steam Canister Humidifier Standard Steam Canister LBS HR 5 5 5 5 5 Evaporator Blower Motor Direct Drive Backward Inclined Variable Speed EC Impeller Airflow Rate CFM 500 750 1 000 1 250 1 600 Motor KW KW 1 0...

Страница 7: ...0 F DB EAT Capacity BTUH 21 760 28 080 40 540 46 910 54 640 Flow Rate PD GPM FT 2 3 0 7 2 9 1 0 4 2 0 1 4 9 0 2 5 7 0 2 Standard Valve TXT 2 way field installed 3 way valves are optional Steam Canister Humidifier Standard Steam Canister LBS HR 5 5 5 5 5 Evaporator Blower Motor Direct Drive Backward Inclined Variable Speed EC Impeller Airflow Rate CFM 500 750 1 000 1 250 1 600 Motor KW KW 1 0 1 0 1...

Страница 8: ...9 4 2 4 7 5 8 5 7 8 3 COMPONENT DATA CHILLED WATER SYSTEMS Reheat Heat Standard Electric Reheat Heat BTUH includes evaporator motor heat Standard Capacity BTUH KW 17 670 5 2 18 245 5 3 18 245 5 3 18 820 5 5 18 820 5 5 Hot Water Heating Coil Optional 180 F EWT 160 F LWT 70 F DB EAT Capacity BTUH 21 760 28 080 40 540 46 910 54 640 Flow Rate PD GPM FT 2 3 0 7 2 9 1 0 4 2 0 1 4 9 0 2 5 7 0 2 Standard ...

Страница 9: ... 34 5 17 6 MOP 45 35 50 40 60 40 35 15 60 45 35 20 60 50 40 20 with Humidifier with or without Hot Gas Reheat Hot Water Steam Reheat Heat No Electric Reheat Heat FLA 20 0 15 2 24 0 18 3 27 2 20 2 20 0 9 8 27 2 21 5 20 6 11 3 31 1 24 1 22 7 11 9 MCA 21 4 16 4 26 4 20 2 30 4 22 6 21 9 10 7 30 4 24 2 22 7 12 6 35 2 27 4 25 4 13 4 MOP 25 20 35 25 40 30 25 15 40 35 30 15 50 40 35 15 with Electric Heat ...

Страница 10: ...Indoor Ceiling Mtd DX Air Cooled Remote Condensing Units Condensers CCU Indoor Ceiling Mtd Centrifugal Blower Air Cooled Remote Condensing Units CCX Indoor Ceiling Mtd Centrifugal Blower Air Cooled Remote Condensers Power Supply 208 1 60 277 1 60 208 3 60 460 3 60 Power Supply 208 1 60 277 1 60 208 3 60 460 1 60 460 3 60 CCU 012 CCX 012 FLA 13 0 10 3 FLA 4 0 3 2 1 8 MCA 15 3 12 1 MCA 5 0 4 0 2 3 M...

Страница 11: ...s Representative for non cataloged system power supply information CWU CGU Indoor Water Glycol Cooled Remote Condensing Units Power Supply 208 1 60 277 1 60 208 3 60 460 3 60 CWU CGU 012 FLA 9 0 7 1 MCA 11 3 8 9 MOP 20 15 CWU CGU 018 FLA 9 6 7 7 MCA 12 0 9 6 MOP 20 15 CWU CGU 024 FLA 12 8 10 9 8 3 5 1 MCA 16 0 13 6 10 4 6 4 MOP 25 20 15 15 CWU CGU 030 FLA 14 1 12 2 9 0 5 6 MCA 17 6 15 3 11 3 7 0 M...

Страница 12: ...apacity of ______ BTU H based on an entering air condition of ______ F DB and ______ F WB ______ RH The evaporator section shall be designed for _____ Volt ______ Phase _____ Hertz main power supply The remote condensing unit section if applicable shall be designed for _____ Volt ______ Phase _____ Hertz main power supply 1 3 Submittals Submittals shall be provided after manu facturer s receipt of...

Страница 13: ...jection at 95 F ambient and be capable of operation to ___ F low ambient air temperature The system shall be refrigerant charged and run tested at the factory prior to ship ment The evaporator and condenser sections shall ship separately with a dry nitrogen charge ready for field refrigerant charging Note 1 See 2 4 1 pg 12 Low Amb Options 2 3 1 2 DX Air Cooled Split Air Handling Outdoor Remote Con...

Страница 14: ...eat rejection at a flow rate of _____ GPM with ____ F EGT and ____ F LGT at ____ F ambient air tem perature Each pump shall be ____ Hp and shall be sized to provide ____ GPM ____ Ft w g total system head The glycol solution shall be ___ ethylene or propylene by volume The drycooler and pump package shall be designed for _____ Volt ______ Phase _____ Hertz main power supply Note See AboveAir Techno...

Страница 15: ...individual heater stage starter contactor and overheat safeties Systems incorporating factory installed electric heaters shall require only single point power to the main unit power distribution The electric heat shall have a capacity of _________ BTU H and a KW rating of ___ KW con trolled in ___ stages 2 4 4 1 1 SCR Fired Heat Reheat Requires MC 2000 The electric heat reheat shall be con trolled...

Страница 16: ... hot gas bypass components shall be factory installed and shall not require additional field refrigerant lines on split DX sys tems 2 5 5 Suction Line Accumulator Each refrigerant circuit shall be provided with a factory installed Suction Line Ac cumulator to prevent liquid slugging of the compressor and excessive refriger ant dilution of the compressor oil during low load conditions The accumulat...

Страница 17: ...with Remote Outdoor Air Cooled Condensing Unit compressor located in condensing unit VCH CCU or XCU Models DX Split Air Hanlding Unit with Remote Indoor Air Cooled Condensing Unit compressor located in condensing unit VCW VCG Models DX Self Contained Water Glycol Cooled VCC Models Chilled Water Air Handling Systems ACCESS PANEL Compressors VCH XWU XGU Models DX Split Air Handling Unit with Remote ...

Страница 18: ... Filter Access 22 88 Base 24 0 Overall 22 81 Base 24 0 Overall 76 0 91 5 with Plenum 15 5 Evaporator Return Air Inlet Grille Plenum Discharge Field Installed Optional Evaporator Supply Air Outlet REAR LEFT TOP FRONT LEFT TOP Dimensional Data Dimensional Data Up Flow MC 2x2 A C s 1 3 Tons UP FLOW 1 thru 3 Tons VCE VCH VCW VCG VCC 012 thru 036 _ ___ UF 100 Front Access Only side panels also removabl...

Страница 19: ...r To Raised Floor 1 0 Duct Flange Connection Filter Access REAR LEFT BOTTOM FRONT LEFT TOP 22 81 C FLOOR STAND OPTIONAL 22 88 Piping Connections Utility Connections 24 0 24 0 22 81 BOTTOM PLAN VIEW 22 88 d n a t S r o o l F l e d o M C t h g i e H l a n i m o N 2 1 1 S F 0 2 1 j d A 4 1 9 8 1 1 S F 0 8 1 j d A 0 2 5 1 4 2 1 S F 0 4 2 j d A 6 2 1 2 Dimensional Data Down Flow MC 2x2 A C s 1 3 Tons D...

Страница 20: ...Rear Left Bottom 22 88 25 0 Access Panel compressor cond coil Access Panel Condenser Blwr Mtr 40 0 4 x 3 4 Hanger Holes Front Right Top 27 0 Center Line Hanger Holes 29 0 to Outside of Hangers 38 0 Center Line Hanger Holes Hanging Rods By Others Condenser Air Inlet 12 88 6 0 14 0 23 75 3 0 14 0 3 56 1 31 19 0 Condenser Air Outlet Access Panel Cond Blwr Mtr Main Electric Box Utility Connections DX ...

Страница 21: ... 012 thru 036 DIMENSIONS inches XCU XCX Model No B C E P Q R S T U V W X Y AA AB AE AF 012 018 024 030 036 44 22 34 16 16 2 3 4 6 7 8 2 16 16 2 3 8 1 5 16 1 5 24 47 1 2 50 2 Side Access 18 24 on Left Right Sides 1 3 Tons Indoor DX Water Glycol Cooled Remote Condensing Units Models CWU CGU 012 thru 036 Rear Left Bottom 22 88 25 0 Access Panel compressor Coax Vlv 20 0 4 x 3 4 Hanger Holes Front Righ...

Страница 22: ..._____________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ _________________________________...

Страница 23: ...ns d 1 208 230V 1 Ph 60 Hz 3 208 230V 3 Ph 60 Hz 4 460 480V 3 Ph 60 Hz 5 575V 3 Ph 60 Hz 7 277V 1 Ph 60 Hz e 00 No Heat E1 Electric Heat 1 Stage E2 Electric Heat 2 Stages ES SCR Fired Electric Heat HE Heat Pump with Auxiliary Electric Heat HG Hot Gas Reheat HP Heat Pump w o Auxiliary Electric Heat HW Hot Water Heat ES SCR Fired Electric Heat ST Steam Heat f 0 No Humidifier H Electrode Canister Hum...

Страница 24: ... Pump Packages 1 2 to 50 HP Outdoor Air Units IAQ Make Up Air HK OA Horizontal Ceiling Mtd 1 to 30 Tons VK OA Vertical Floor Mtd 1 to 30 Tons RT OA Rooftop DOAS 3 to 72 Tons MissionCritical Units Precision A C s HK Horizontal High Static Ceiling Mounted A C s 1 to 30 Tons SC 2x4 SpotCool Ceiling Mounted A C s 1 to 3 Tons Comfort Units A C s Water Source Heat Pumps FC Floor Console Mtd A C s Up Flo...

Отзывы: