72
Figure 3-C
3-4-2. Scheduling Control
3-2-3-2. Scheduling–Scheduling control function descriptions
Scheduling control allows
time of use
users to customize the charging/discharging time of the
ESS system to charge the battery usually at night or before dawn when the electricity price is lower.
During the periods when the electricity price is higher, if the solar power generating power is lower
than the required load power, discharge the battery for the load to use.
As shown in figures 3-D, 3-E, 3-F, between the hours of 12:00am and 6:00am, purchase electricity
with lower price to charge the battery and also purchase electricity for the load to use.
After 6:00am, ESS confirms that the battery power is sufficient, therefore it discharges for the load
to use. Between the hours of 9:00am~15:00pm, the solar power generation power is greater than
the load need, so now the excessive solar power will be processed according to the feed-in power
setting set by the user.
1. When the user set it as “
do not allow feed-in,
as shown in Figure 3-D, the excessive solar
power will first charge the battery.The charging current will be adjusted according to the battery
capacity. When the battery is fully charged or that the charging power was not enough to
absorb all the solar power, the inverter will limit the output power until the feed-in power of the
utility grid is zero.
2. When the user set it as “
allow feed-in
, as shown in Figure 3-E, the excessive solar power will
all be fed to the utility grid.
Содержание EnerSalvys AB-ESSINV
Страница 1: ...3 4 5 kW EnerSalvis Energy Storage System User Manual...
Страница 9: ...8 Smart meter ESS MET Model Dimensions mm ESS MET Width 343 Height 403 Depth 106...
Страница 23: ...22...
Страница 26: ...25...
Страница 34: ...33 Equipped with two battery cabinets and 6 battery packs...
Страница 40: ...39 Step 4 Turn on the AC breaker to complete the installation of the smart meter Turn on AC breaker...
Страница 45: ...44 The heatsink temperature can be displayed in Celsius or Fahrenheit as shown in Figure N1 and N2 M1 N1 M2 N2...
Страница 52: ...51 Function menu Function menu Setting Meter Profile Information Function menu block figure...
Страница 75: ...74 Figure 3 F...
Страница 84: ...83 ER 137 BMS6 temperature too low BMS of battery pack 6 detects battery temperature too low...