Ablerex EnerSalvys AB-ESSINV Скачать руководство пользователя страница 65

 

64

 

 

This page according to the system connection type(1p2w/1p3w) displays the power information of 
the utility grid, including: 

 

1.  System frequency(Hz) 
2.  Voltage(Vac) 
3.  Current(Aac) 
4.  Real power(kW) 
5.  Reactive power(kVAR) 
6.  Apparent power(kVA) 
7.  Power factor P.F. 
8.  Accumulated Energy of Power consumption (kWh) 
9.  Accumulated Energy of Feed-in electricity (kWh) 
10. Accumulated Energy of Overall energy (kWh)   
 

 
 
 
 

 

Содержание EnerSalvys AB-ESSINV

Страница 1: ...3 4 5 kW EnerSalvis Energy Storage System User Manual...

Страница 2: ...8 Battery Cabinet Installation 28 2 9 Smart Meter Installation 35 3 Operation and Function Description 40 3 1 ESS INV 2 9 Inch Panel Function Description 40 3 1 1 2 9 Inch Panel Measurement Message Di...

Страница 3: ...2 3 3 Communication Interface 69 3 4 Control Mode Description 70 3 4 1 Self Consumption Control 70 3 4 2 Scheduling Control 72 4 Troubleshooting and Solutions 75 5 Specifications Table 84...

Страница 4: ...h and error free operation of your solar system for years to come However a power system with PV inverter is a complicated system and failures may occur If you encounter any errors or malfunctions in...

Страница 5: ...al technicians and only after all AC and DC power are completely disconnected from ESS ESS must be disconnected from the utility and make sure that there is no accidental connection with the utility T...

Страница 6: ...eed Caution Residual Please refer to the user manual 10min 5 Description Caution Risk of electric shock Caution Danger Caution high temperature on surface The temperature on the surface of the ESS mig...

Страница 7: ...e the open circuit voltage of the PV array under intensive sun with ambient temperature of 13 F 25 C does not exceed maximum withstanding voltage of EnerSolis 500Vdc Voltage exceeding 500Vdc will caus...

Страница 8: ...aic inverter ESS INV battery cabinet ESS BAT and smart meter ESS MET 1 1 External Dimensions Photovoltaic inverter ESS INV equipped with a battery cabinet ESS BAT Model Dimensions mm ESS3300 ESS4000 E...

Страница 9: ...8 Smart meter ESS MET Model Dimensions mm ESS MET Width 343 Height 403 Depth 106...

Страница 10: ...e charging discharging functions of the battery to adjust the power flow of the solar system 2 LCD display panel and LED indicators Displays operating information and status of the photovoltaic invert...

Страница 11: ...ery communication terminal of the battery cabinet 4 Optional Communication Interface expansion slot Functions such as USB Dry Contact and TCP IP can be purchased optionally 5 AC terminal unit Connects...

Страница 12: ...cabinet Connects to the battery communication terminal of the photovoltaic inverter 1 LCD touch screen Used to monitor the energy storage system including the operation status of the photovoltaic inve...

Страница 13: ...f the machine is damaged The external packaging can be recycled and used repeatedly Remove the energy storage system from the cardboard box and check the contents of the package Standard accessories i...

Страница 14: ...ng recommendations to select the most suitable location to install the photovoltaic inverter The photovoltaic inverter uses an outdoor design and complies with the IP65 protection level allowing it to...

Страница 15: ...med whether the wall mount location will allow the photovoltaic inverter to tilt forward backwards When selecting an installation site there must be sufficient space for the heat generated from photov...

Страница 16: ...whether it can withstand the weight of PV inverter It is recommended to install the unit vertically on a solid concrete or a brick wall Wall mount installation steps Step 1 Place the backplane positio...

Страница 17: ...16 If there is the need for battery cabinet expansion an additional battery cabinet backplane must be installed Backplane positioning paper...

Страница 18: ...d in the mounts Finally lock the nuts on the four corners tightly in place Step 3 Hang the battery cabinet on the wall mount and confirm whether it is properly seated in the mounts Finally lock the nu...

Страница 19: ...the wall mount and confirm whether it is properly fixed in the mounts Finally lock the nuts on the four corners tightly in place Step 5 Check whether the inverter and battery cabinet is properly insta...

Страница 20: ...er and the photovoltaic array is installed Note The Ue 600Vdc Ie 20A specification breaker is recommended Confirm that the breaker between the inverter and back up power load is installed Note AC brea...

Страница 21: ...the AC input output of the inverter please confirm whether the circuit breaker connected to the utility grid is open The utility grid circuit breaker can only be closed when the electrical installatio...

Страница 22: ...e risk of electrical shock please confirm the ground cable is properly grounded before operating the photovoltaic inverter Step 5 Lock the AC waterproof cover properly ESS3300 2 05 3 5 12 ESS4000 ESS5...

Страница 23: ...22...

Страница 24: ...grid is open The utility grid circuit breaker can only be closed when the electrical installation of the photovoltaic inverter is completed Step 2 Remove the cover of the AC back up power input Step...

Страница 25: ...output to the AC breaker and then connect it to the load To prevent the risk of electrical shock please confirm the ground cable is properly grounded before operating the photovoltaic inverter Step 4...

Страница 26: ...25...

Страница 27: ...rent numbers of photovoltaic arrays as shown in the figure below 2 Parallel connection mode When a single string of photovoltaic array is connected to string A and String B users must enter setting mo...

Страница 28: ...27 Recommended PV panel input wiring wire diameter Model Diameter mm Area mm 2 AWG no ESS INV 3 2 05 3 5 12 ESS INV 4 ESS INV 5 2 59 5 5 10...

Страница 29: ...the wiring between the battery cabinet and the inverter Each battery cabinet is equipped with two sets of positive negative terminals and communication terminal Please refer to the explanations in th...

Страница 30: ...place in the order from bottom to top as the figure below 1 3 and lock in the screws on both sides to keep them in place Step 4 Insert the battery output terminal into the connector on the battery cab...

Страница 31: ...30 Step 5 Connect the communication cable Please wire according to the connection method shown in the figure below...

Страница 32: ...3 4 2 Terminating battery pack The terminating battery pack only needs to be turned on for the battery pack with the last communication ID Its goal is to increase the stability for communication Plea...

Страница 33: ...32 Communication ID and terminal resistance setting example Equipped with one battery cabinet and 3 battery packs...

Страница 34: ...33 Equipped with two battery cabinets and 6 battery packs...

Страница 35: ...34 Step 7 Cover the top cover of the battery cabinet and turn on the DC breaker on the inverter to complete all battery cabinet installation...

Страница 36: ...fore installation in order to prevent the installation personnel getting shocked Step 1 Install the smart meter on the wall and use screws to lock each corner Step 2 Open the outer door of the smart m...

Страница 37: ...common coupling PCC According to the system connection 1P2W 1P3W please refer the figure below to install the CTs and wiring cables 1P2W system 1 Wiring AC input cables to the terminals Line Neutral...

Страница 38: ...point of common coupling of each hot wire Line 1 Line 2 so that CTs are able to measure the current which includes ESS INV and load 2 Wiring AC input cables to the terminals Line Neutral Ground 3 The...

Страница 39: ...as Data A Pin7 as Data B 3 There are two RJ45 port on the ESS INV can be use each port is connect in parallel inside so just select one port for communication with ESS MET and the other one is use fo...

Страница 40: ...39 Step 4 Turn on the AC breaker to complete the installation of the smart meter Turn on AC breaker...

Страница 41: ...function or DC input insulation resistance too low Utility grid power Photovoltaic array Photovoltaic inverter Photovoltaic inverter power generation indicator Operation flow display which means the r...

Страница 42: ...e photovoltaic inverter Set Search Previous page Next page Confirm setting changes Inch Panel Measurement Message Display Operations photovoltaic inverter activates all LED indicators light up and all...

Страница 43: ...Figure C String A input current is as shown in Figure D String B input current is as shown in Figure E String A input power is as shown in Figure F String B input power is as shown in Figure G Output...

Страница 44: ...accumulated power generation capacity exceeds 10000KWH the power generation capacity information will be displayed with rotation for example when the accumulated power generation capacity is 999999KWH...

Страница 45: ...44 The heatsink temperature can be displayed in Celsius or Fahrenheit as shown in Figure N1 and N2 M1 N1 M2 N2...

Страница 46: ...unction code will be displayed on the LCD display the red LED light will flash during this time Emergency power off When the user short circuit the EPO terminal the photovoltaic inverter will stop out...

Страница 47: ...ate on Settings mode allows changing of country setting set the photovoltaic array and machine number Please make changes to the settings as needed Do not change any other settings or else it photovol...

Страница 48: ...change between standard or parallel connection mode which shows individually as Figures P1 and P2 below Standard mode PAR Parallel connection mode nterbuttonse to enter settings for the photovoltaic i...

Страница 49: ...6 Wait until saving is complete and then please restart the R 48 nterbuttonse to end settings mode SAVE panel at this time as shown in Figure R Step 6 Wait until saving is complete and then please res...

Страница 50: ...S system Icon descriptions of frequently used functions are as follows Icon Description Save function Saves the changed setting parameter into memory Note Changed parameters must be saved in order for...

Страница 51: ...olor changes between red yellow and green according to the state of charge SOC 9 Battery information display Voltage state of charge SOC 10 Communication connection status display connected disconnect...

Страница 52: ...51 Function menu Function menu Setting Meter Profile Information Function menu block figure...

Страница 53: ...ill display a simple abnormal status reminder If there are more than abnormal statuses they will be displayed in turns Users can also click the abnormal status directly to view details including the e...

Страница 54: ...f the main screen in order to gain different privileges Once a user has logged in the original login screen will change to a logout button Click this button to logout 1 Click to open the login screen...

Страница 55: ...sion Displays the controller firmware version of the inverter 2 DC DC converter information Rated power Displays the rated power of DC DC converter Rated voltage Rated voltage battery terminal of the...

Страница 56: ...3 3 2 2 ESS BAT 1 Type Displays the type of battery packs 2 Nominal voltage Displays the nominal voltage of the equipped battery 3 Total Capacity Displays the total capacity of the equipped battery 1...

Страница 57: ...S MET Software version Software version of ESS MET Firmware version Firmware version of ESS MET Cloud server status Displays the connection status between ESS MET and the cloud server 2 ESS MET networ...

Страница 58: ...ower company When the user selects a control mode the save icon must be pressed to change the settings Self consumption mode setting Users can select whether feed in powertoutility grid under this mod...

Страница 59: ...of the energy storage system Once the feed in power setting is decided the save icon must be clicked Then will the execute function icon appear Once this icon is clicked it will startactivating the s...

Страница 60: ...not allow feed in power if feed in power allowed is selected users can also select the limit on how much power to feed 1 5kW 1 Add Add a new schedule When a new schedule is added users can change the...

Страница 61: ...this icon is clicked it will start activating the scheduling mode control When execution starts the original execute function icon will change to the stop function icon Press this icon to stop the sch...

Страница 62: ...61 3 Battery Pack Number Users must select the exactly equipped number of battery pack If the number of battery pack is not correct battery number setting error will show up...

Страница 63: ...rror occurred 2 Language Users can select various language as Chinese English Japanese Italian French 3 Screensaver Enable Disable screensaver and set the idle time to start screensaver 4 Restore fact...

Страница 64: ...Meter Function Description The function of the meter is to provide information on the entire system including utility grid energy storage system ESS and battery 3 2 4 1 Meter Utility Grid 1p2w page 1...

Страница 65: ...f the utility grid including 1 System frequency Hz 2 Voltage Vac 3 Current Aac 4 Real power kW 5 Reactive power kVAR 6 Apparent power kVA 7 Power factor P F 8 Accumulated Energy of Power consumption k...

Страница 66: ...tring A B 1 DC input voltage Vdc 2 DC input current Adc 3 Power of each string kW 4 Power summation of string A B kW On grid 1 System voltage Vac 2 Current Aac 3 Inverter input output power kW 4 Accum...

Страница 67: ...Battery current Current A 3 State of charge of battery SOC 4 Battery temperature Temp If the connection from ESS to the battery pack failed the fields described above will display as gray empty space...

Страница 68: ...5 1 Utility grid power This page displays the utility grid power curve recorded by the system The positive power represents consumed power and the negative power represents power of fed in Utility gri...

Страница 69: ...Solar power generation amount This page displays the solar power generation curve recorded by the system The system will record an entry every hour Utility grid power solar power generation amount lo...

Страница 70: ...emergency power off RJ45 connector The inverter can be forced to power off by short circuiting Pin4 and Pin5 Note Confirm that the cables of the RJ45 connector are connected properly The EPO function...

Страница 71: ...n the depleted status at first from 0 00am to 6 00am there is load consumption therefore ESS MET measured that it was in the purchase electricity status within this period However since the battery wa...

Страница 72: ...g to the current feed in power until the feed in power of the utility grid is less than the limit feed in power set by the user When the battery is fully charged or the charging current has reached it...

Страница 73: ...to use After 6 00am ESS confirms that the battery power is sufficient therefore it discharges for the load to use Between the hours of 9 00am 15 00pm the solar power generation power is greater than t...

Страница 74: ...charged or the charging current has reached its top limit the inverter will limit the output power After 17 00pm the solar power generation power is less than the load requirement therefore ESS MET m...

Страница 75: ...74 Figure 3 F...

Страница 76: ...c inverter specifications 4 Restart the photovoltaic inverter If the malfunction continues to occur please contact the supplier AL01 Utility grid voltage too low AL02 Utility grid voltage frequency to...

Страница 77: ...ng and architecture of the utility grid 3 Restart the photovoltaic inverter If the malfunction continues to occur please contact the supplier AL11 Abnormal insulation resistance The DC input insulatio...

Страница 78: ...en reconnect the photovoltaic array with the photovoltaic inverter 3 If the malfunction continues to occur please contact the supplier ER02 Sub control failure Sub controller unable to operate normall...

Страница 79: ...rt circuit ER14 Abnormal photovoltaic inverter phase lock Photovoltaic inverter unable to synchronize with utility grid phase during AC power on sequence ER29 DC component in photovoltaic inverter AC...

Страница 80: ...are program detected DC bus voltage too high ER63 DC bus under voltage F W Firmware program detected DC bus voltage too low ER64 DC bus 1 over voltage FW Firmware program detected DC bus 1 voltage too...

Страница 81: ...System Setting Battery Pack Number is correct ER92 BMS1 over voltage BMS of battery pack 1 detects battery over voltage 1 Wait until the abnormal parameters return to normal then just reset the abnor...

Страница 82: ...tery under voltage ER 110 BMS3 over current BMS of battery pack 3 detects battery over current ER 111 BMS3 short circuit protection BMS of battery pack 3 detects battery short circuit ER 112 BMS3 temp...

Страница 83: ...re too high BMS of battery pack 5 detects battery temperature too high 1 Wait until the abnormal parameters return to normal then just reset the abnormality 2 If the malfunction continues to occur ple...

Страница 84: ...83 ER 137 BMS6 temperature too low BMS of battery pack 6 detects battery temperature too low...

Страница 85: ...0 450Vdc Number of MPPT tracker 1 2 2 Topology Non isolated type AC Input Output Nominal AC power 3300W 4000W 5000W Peak power 3300Wp 4000Wp 5000Wp Max apparent power 3300VA 4000VA 5000VA Nominal AC v...

Страница 86: ...V Topology Isolated type Efficiency Max conversion efficiency 97 1 Euro efficiency 96 5 System efficiency 94 Environmental Ambient Temperature 25 C to 50 C 13 F 122 F 25 C to 40 C 13 F 104 F For outpu...

Страница 87: ...De rating output power EPO Emergency power off Inverter powers off and stops its output and remains in standby mode DC PV reverse polarity protection Internal diode clamp Internal DC AC surge protecti...

Страница 88: ...500W Max discharge current 20A 40A 55A Discharge end voltage 45 5V Charge Equipped battery pack 1 2 2 Max charge power 1000W 2000W 2500W Max charge current 20A 40A 55A Charge voltage 53 3V Environment...

Страница 89: ...106mm Weight 7kg Protection class IP20 Indoor Safety and EMC IEC 61010 1 IEC 61326 1 Operating ambient temperature 0 C to 40 C Storage ambient temperature 20 C to 70 C Relative Humidity 0 95 non cond...

Отзывы: