3-3. Communication Interface
RS-485Communication Interface settings are as follows:
Baud rate
9600 bps
Data length
8 bits
Stop bit
1
Parity
None
RS-485 pin definitions are as follows:
EPO (emergency power off) RJ45 connector
The inverter can be forced to power off by short-circuiting Pin4 and Pin5.
Note:
Confirm that the cables of the RJ45
connector are connected properly.
The EPO function is an emergency power
switch and remains in standby mode;
short-circuit the defined pins as shown in
the figure to the right to force the
photovoltaic inverter to stop operating
immediately.
Содержание EnerSalvys AB-ESSINV
Страница 1: ...3 4 5 kW EnerSalvis Energy Storage System User Manual...
Страница 9: ...8 Smart meter ESS MET Model Dimensions mm ESS MET Width 343 Height 403 Depth 106...
Страница 23: ...22...
Страница 26: ...25...
Страница 34: ...33 Equipped with two battery cabinets and 6 battery packs...
Страница 40: ...39 Step 4 Turn on the AC breaker to complete the installation of the smart meter Turn on AC breaker...
Страница 45: ...44 The heatsink temperature can be displayed in Celsius or Fahrenheit as shown in Figure N1 and N2 M1 N1 M2 N2...
Страница 52: ...51 Function menu Function menu Setting Meter Profile Information Function menu block figure...
Страница 75: ...74 Figure 3 F...
Страница 84: ...83 ER 137 BMS6 temperature too low BMS of battery pack 6 detects battery temperature too low...