What You See on the Display
What You Do
Comments
Linearity Test
1.
Press
On/Off
to turn on monitor.
The Abbott logo screen will appear in black for
a few seconds and then will appear in gray to
ensure that the display is functioning properly.
Next, the software version and then the
Test
Mode
menu screens will appear.
2.
Press the
Menu
button
.
The monitor starts in
Test Mode
. The Menu
button will toggle the monitor to
Menu Mode
.
3.
Press
4
to select
Linearity Test
.
4.
Press
Scan
or manually enter the
Operator ID
via the keypad,
then press
Enter
.
While the Operator ID may be up to 30
digits, not all digits will fit on the display. The
monitor may also be set to truncate (ignore)
leading, trailing, and/or selected digits of the
barcode.
The Linearity Test menu enables you to verify method linearity using a RNA Medical® brand Glucose Calibration
Verification Control (CVC) kit. This kit contains assayed materials for use in confirming the calibration and linearity of
glucose at the upper and lower limits of the reportable range and at three (3) points within the range. Each CVC kit is
designed for specific test strip types. Please refer to the CVC package insert for compatible test strip types and detailed
instructions for use.
Please use the following procedure to perform a Linearity Test. This functionality may or may not be available depending
on the configuration of the monitor through the data management system.
Note:
This section is only for Point of Care Coordinators, not operators. It illustrates some common settings.
Depending on your institution’s specific settings, some screens will display differently or not at all.
If the monitor does not display the screens shown, please refer to Chapter 10, Troubleshooting.
IMPORTANT
: Patient testing should be run in patient test mode only. Results obtained in Linearity test mode
should only be used to assess system linearity performance.
7-1
Questions?
Refer to Page 10-9 For Technical Support Instructions.
Chapter 7: Linearity Test
Note:
You must use the same strip lot for the entire panel when performing a Linearity Test.
Содержание Precision XceedPro
Страница 21: ...4 Control Test Operating Guidelines for Control Solution Testing Control Test Procedure Glucose ...
Страница 35: ...6 Proficiency Test ...
Страница 39: ...7 Linearity Test ...
Страница 55: ...9 Data Upload Docking Station Connecting Cables to the Docking Station Mounting Instructions ...
Страница 71: ...11 Maintenance Cleaning the Exterior Surface Replacing the Port Protector Battery Life Replacing the Batteries ...