![ABB UNO-DM-6.0-TL-PLUS Скачать руководство пользователя страница 92](http://html.mh-extra.com/html/abb/uno-dm-6-0-tl-plus/uno-dm-6-0-tl-plus_product-manual_4202092.webp)
- 92 -
000781AG
7 - Operation
• Open an internet browser (reccomended browser: Chrome versions
from v.55, Firefox versions from v.50) and enter the pre-set IP address
192.168.117.1
to access the setup pages (web user interface).
A guided setup procedure will open that will enable you to impose the
necessary settings for correct commissioning of the inverter.
The language of the wizard could be changed by clicking on the upper status bar
The required informations during the procedure are:
STEP 1 - Administrator/User login credentials
-
Set the
Administrator
account user and pas-
sword (minimum 8 character for password):
Administrator account can open and view the contents
of photovoltaic site. Additionally, they can make changes
to inverter settings. User and password are CASE SEN-
SITIVE.
-
Set the
User
account user and (optional) pas-
sword (minimum 8 character for password):
User account can only read data. It cannot make any
changes. User and password are CASE SENSITIVE.