eneral conditions
The equipment is installed depending on the system and the place where it is installed. Its
performance therefore depends on the correctness of the connections.
Staff authorised to carry out the installation must be specialised and
experienced in this job; they must also have received suitable training on
equipment of this type.
The operation must be carried out by qualified personnel and it is advisable
to adhere to the indications provided in this manual, the diagrams and
the enclosed documentation.
For safety reasons, only a qualified electrician who has received training and/or demon
-
strated skills and knowledge on the structure and operation of the unit may install the inverter.
The installation must be performed by qualified installers and/or licensed electricians in ac
-
cordance with the existing regulations in the country of installation.
Connection of the photovoltaic system to an electric installation connected to the distribution
grid must be approved by the electricity provider.
The removal of the inverter panels/covers allows access to the area dedicated to service
personnel (the operator is not authorized to access this area)
Warning! Electric Shock Hazard! No internal parts of the inverter (included exposed
component e.g. Back-up battery, Memory Card, etc...) are to be considered as SELV!
Warning! Electric Shock Hazard! The installation must be carried out with the equip-
ment disconnected from the grid (external power disconnect switch open) and from
the photovoltaic generator, with the photovoltaic panels shaded or isolated.
Warning! Electric Shock Hazard! When the photovoltaic panels are exposed to sun-
light they provide continuous DC voltage to the inverter.
5
Installation