
46
“Operation and installation manual”
EN
6.1.2 Components supplied with the EVSE
When the EVSE is unpacked, make sure all components supplied with the EVSE are present:
Component
Description
Quantity
Keys to open the EVSE front door
2
Nuts to install the EVSE to the floor
6
Bolts + W Nuts to install AC and
PE cables
4 + 8 + 4
(Preinstalled on the
AC terminals and PE
busbar)
Caps to be installed in place of the
eyebolts
4
6.2 Installation of the EVSE
6.2.1 Install the charging cables on the optional CMS
If the EVSE is equipped with CMS
(51)
, the charging cables must be hooked up on the respective CMS using
the Cable clamp
(53)
.
53
51