
42
“Operation and installation manual”
EN
5.4.2 Install the Main AC protection barriers
At the end of operation on the Main AC terminals
(33)
or AC input fuse
(32),
is necessary to install the Main AC
protection barriers
(42)
to ensure the safety of the EVSE.
42
32
33
42
• Install the three Main AC protection barriers
(42)
using
the six M5 screws (2 on each protection barrier).
• Tighten the screws to 11.5 lbf-in (1.3 Nm).