ABB | SACE Emax 2
48 | © 2013
ABB |
1SDH001000R0002 - L7804
Ekip Dip protection release | 4 - Test
Opening command test
The opening command test can be performed directly on the release or from Ekip Connect.
To perform the release test:
Phase
Operation
1
Make sure that the CB is closed and that there are no primary currents present
2
Connect a module to the front test connector of frontal test
3
Press the iTest push-button for at least 9 seconds
4
Check that the CB opens and that the TU Reset button comes out
To perform the test from Ekip Connect:
Phase
Operation
1
Make sure that the CB is closed and that there are no primary currents present
2
Connect Ekip T&P or Ekip Bluetooth to the front test connector
3
Start the communication with Ekip Connect
4
Select the Trip Test command
5
Check that the CB opens and that the TU Reset button comes out
Further information on Ekip Connect is available from the web site http://www.abb.com/
abblibrary/DownloadCenter/, in particular with the manual
.
Содержание SACE Emax 2
Страница 2: ...ABB SACE Emax 2 2 2013 ABB 1SDH001000R0002 L7804 ...
Страница 7: ...ABB SACE Emax 2 3 2013 ABB 1SDH001000R0002 L7804 ...
Страница 271: ...1SDH001000R0002 L7804 ...