
ABB | SACE Emax 2
Electronic accessories | 4 - Ekip Signalling 4K module
183 | © 2013
ABB |
1SDH001000R0002 - L7804
Continued from the previous page
The following table describes the programmable actions on the release:
Action
Description
Trip RESET
Reset of the opening signal.
Energy RESET
Resetting the energy counters (see the chapter "15 - Measuring
Measurements", and the paragraph "Energy meters", on page
135).
External Trip
Opening of the circuit-breaker.
Switch On LOCAL
Switching of the connection from remote to local (see the
chapter "6 - Menu", and the paragraph "Settings Menu", on
page 69).
Signalling RESET
Reset of the signals.
YO Command
Tripping of the opening coil.
YC Command
Tripping of the closing coil.
Switch On SET B
Switching the protections from configuration A to configuration
B (see the chapter "11 - Hi-Touch protections", and the
paragraph "Set A-B", on page 108).
Содержание SACE Emax 2
Страница 2: ...ABB SACE Emax 2 2 2013 ABB 1SDH001000R0002 L7804 ...
Страница 7: ...ABB SACE Emax 2 3 2013 ABB 1SDH001000R0002 L7804 ...
Страница 271: ...1SDH001000R0002 L7804 ...