
ABB | SACE Emax 2
Electronic accessories | 5 - Ekip Signalling 2K modules
191 | © 2013
ABB |
1SDH001000R0002 - L7804
Continued from the previous page
The following table describes the programmable actions on the release:
Action
Description
External Trip
Execution of an opening.
Trip Reset
Reset of the opening signal.
Switch on Set B
Switching of the protections, according to the configuration,
from A to B (see paragraph "Settings Menu", in chapter "6
- Menu").
Switch on Local
Switching of the connection from remote to local (see
paragraph "Set A-B", in chapter "11 - Hi-Touch protections").
Signalling Reset
Reset of the signals.
Energy Reset
Resetting of the energy meters (see paragraph "Energy
meters", in chapter "15 - Measuring Measurements").
Содержание SACE Emax 2
Страница 2: ...ABB SACE Emax 2 2 2013 ABB 1SDH001000R0002 L7804 ...
Страница 7: ...ABB SACE Emax 2 3 2013 ABB 1SDH001000R0002 L7804 ...
Страница 271: ...1SDH001000R0002 L7804 ...