ABB | SACE Emax 2
Putting into service and maintenance
1 - Putting into service
43 | © 2023 ABB | 1SDH001000R0002 - ECN000297030
Putting into service and maintenance
1 - Putting into service
Introduction
The general check is necessary:
• when the circuit-breaker is put into service for the first time
• after prolonged inactivity of the circuit-breaker
HAZARD! RISK OF ELECTRIC SHOCK! Test the circuit-breaker with all switchgear apparatus
de-energized.
IMPORTANT: The verifications involve procedures which must only be performed by
persons skilled in the electrical field (IEV 195-04-01): person with sufficient training and
experience to enable him or her to perceive risks and avoid the dangers potentially
created by electricity).
Terminal wiring
Indication of cable size for wiring terminals:
2
1
8mm
0,5 2,5mm
2
0,5 1,5mm2
Max O 3,3mm
Max O , 3
0 1 "
Max O 3,3mm
Max O , 3
0 1 "
0.31"
8mm
0.31"
Figure 77