background image

1.3 

Product documentation

1.3.1 

Product documentation set

P

la

nni

n

&

 p

ur

cha

se

E

n

gi

nee

ring

In

st

al

ling

C

om

m

iss

io

n

ing

O

p

e

ra

tio

n

M

a

in

te

na

nc

e

D

ec

om

m

issi

oni

n

g

de

inst

a

lli

n

g

&

 d

is

pos

a

l

Application manual

Operation manual

Installation manual

Service manual

Engineering manual

Commissioning manual

Communication protocol
manual

Technical manual

P

la

nni

n

&

 p

ur

cha

se

E

n

gi

nee

ring

In

st

al

ling

C

om

m

iss

io

n

ing

O

p

e

ra

tio

n

M

a

in

te

na

nc

e

D

ec

om

m

issi

oni

n

g

de

inst

a

lli

n

g

&

 d

is

pos

a

l

P

la

nni

n

&

 p

ur

cha

se

E

n

gi

nee

ring

In

st

al

ling

C

om

m

iss

io

n

ing

O

p

e

ra

tio

n

M

a

in

te

na

nc

e

D

ec

om

m

issi

oni

n

g

de

inst

a

lli

n

g

&

 d

is

pos

a

l

Application manual

Application manual

Operation manual

Operation manual

Installation manual

Installation manual

Service manual

Service manual

Engineering manual

Engineering manual

Commissioning manual

Commissioning manual

Communication protocol
manual

Communication protocol
manual

Technical manual

Technical manual

en07000220.vsd

IEC07000220 V1 EN

Figure 1:

The intended use of manuals in different lifecycles

The engineering manual contains instructions on how to engineer the IEDs using
the different tools in PCM600. The manual provides instructions on how to set up a
PCM600 project and insert IEDs to the project structure. The manual also
recommends a sequence for engineering of protection and control functions, LHMI
functions as well as communication engineering for IEC 61850 and DNP3.

The installation manual contains instructions on how to install the IED. The
manual provides procedures for mechanical and electrical installation. The chapters
are organized in chronological order in which the IED should be installed.

The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for checking
of external circuitry and energizing the IED, parameter setting and configuration as
well as verifying settings by secondary injection. The manual describes the process

Section 1

1MRS756801 A

Introduction

4

630 series

Commissioning Manual

Содержание Relion 630 Series

Страница 1: ...Relion Protection and Control 630 series Commissioning Manual...

Страница 2: ......

Страница 3: ...Document ID 1MRS756801 Issued 15 09 2009 Revision A Product version 1 0 Copyright 2009 ABB All rights reserved...

Страница 4: ...copied or disclosed only in accordance with the terms of such license Trademarks ABB and Relion are registered trademarks of ABB Group All other brand or product names mentioned in this document may...

Страница 5: ...cerning electrical equipment for use within specified voltage limits Low voltage directive 2006 95 EC This conformity is the result of tests conducted by ABB in accordance with the product standards E...

Страница 6: ...roduct failure would create a risk for harm to property or persons including but not limited to personal injuries or death shall be the sole responsibility of the person or entity applying the equipme...

Страница 7: ...ectrician is allowed to carry out the electrical installation National and local electrical safety regulations must always be followed The frame of the IED has to be carefully earthed The IED contains...

Страница 8: ......

Страница 9: ...n PCM600 and the IED 13 Writing an application configuration to the IED 17 Checking CT circuits 17 Checking VT circuits 18 Checking the RTXP test switch 18 Checking transducer circuits 19 Checking bin...

Страница 10: ...communication errors 29 Checking the communication link operation 30 Checking the time synchronization 30 Running the display test 30 Indication messages 31 Internal faults 31 Warnings 32 Additional...

Страница 11: ...of testing an IED in a substation which is not in service The chapters are organized in chronological order in which the IED should be commissioned 1 2 Intended audience This manual addresses the per...

Страница 12: ...ded use of manuals in different lifecycles The engineering manual contains instructions on how to engineer the IEDs using the different tools in PCM600 The manual provides instructions on how to set u...

Страница 13: ...ating configurations according to specific application requirements The technical manual contains application and functionality descriptions and lists function blocks logic diagrams input and output s...

Страница 14: ...the reader to important facts and conditions The tip icon indicates advice on for example how to design your project or how to use a certain function Although warning hazards are related to personal...

Страница 15: ...61850 IEC 60617 ANSI Protection Three phase non directional overcurrent low stage PHLPTOC 3I 51P 1 Three phase non directional overcurrent high stage PHHPTOC 3I 51P 2 Three phase non directional overc...

Страница 16: ...LS R 81LSH Transformer differential protection for two winding transformers TR2PTDF 3dI T 87T Fault locator SCEFRFLO FLOC 21FL Distance protection DSTPDIS Z 21 21P 21N Automatic switch onto fault logi...

Страница 17: ...ge phase to earth voltages RMS VPHMMXU 3Upe 3Upe Three phase voltage phase to phase voltages RMS VPPMMXU 3Upp 3Upp Residual current RESCMMXU I0 I0 Residual voltage RESVMMXU U0 Vn Sequence current CSMS...

Страница 18: ...10...

Страница 19: ...iguration Pre configured Modified existing configuration Site acceptance testing SAT or commissioning testing is typically done to verify that the new installed IED is correctly set and connected to t...

Страница 20: ...ng a whole cubicle to energizing a single IED The IED time must be set The self supervision function in the Main menu Monitoring IED statusorMain menu Monitoring Internal events menu in LHMI should al...

Страница 21: ...direct link point to point or 3 Connect the PC or workstation to the LAN WAN network 4 Configure the IED IP addresses in the PCM600 project for each IED to match the IP addresses of the physical IEDs...

Страница 22: ...0096 V1 EN Figure 2 Point to point link between IED and PCM600 using a null modem cable The following description is an example valid for standard PCs using Microsoft Windows operating system The exam...

Страница 23: ...ow see Figure 4 IEC09000356 1 en vsd IEC09000356 V1 EN Figure 4 Right click Local Area Connection and select Properties 3 Select the TCP IP protocol from the list of configured components using this c...

Страница 24: ...e 6 IEC09000358 1 en vsd IEC09000358 V1 EN Figure 6 Select Obtain an IP address automatically 5 Close all open windows and start PCM600 Setting up the PC to access the IED via a network This task depe...

Страница 25: ...an application configuration and how to write to IED Set setting parameters through the LHMI See the operation manual for information on how to change a setting from the LHMI 2 7 Checking CT circuits...

Страница 26: ...ted Test the circuitry Polarity check VT circuit voltage measurement primary injection test Earthing check Phase relationship Insulation resistance check The polarity check verifies the integrity of c...

Страница 27: ...contact are of current circuit type 2 Verify that the short circuit jumpers are located in the correct slots Voltage circuit 1 Verify that the contact are of voltage circuit type 2 Check that no shor...

Страница 28: ...e in accordance with the IED specifications 2 12 Checking optical connections Check that the Tx and Rx optical connections are correct An IED equipped with optical connections requires a minimum depth...

Страница 29: ...and GOOSEINTLKRCV must be set to On in the application configuration 3 2 Verifying the communication Connect your PC to the nearby switch and ping the connected IED and the Substation Master PC to ve...

Страница 30: ...22...

Страница 31: ...me tagged events and to exclude analog information and so on The disturbance report settings must be checked to ensure that indications are correct Functions to test signal and parameter names can be...

Страница 32: ...to provide a three phase supply of currents and for some START functions also voltage The magnitude and angle of currents and voltages should be possible to vary Check that the IED is prepared for te...

Страница 33: ...nt When a number of protection IEDs of the same type are tested the test plug handle only needs to be moved from the test switch of one protection IED to the test switch of the other without altering...

Страница 34: ...interconnected ones have the parameters Blocked and eventually EvDisable are set to No and Yes respectively Remember that a function is also blocked if the BLOCK input signal on the corresponding fun...

Страница 35: ...uency 4 Inject an unsymmetrical three phase voltage and current to verify that phases are correctly connected If some setting deviates check the analog input settings under Main menu Configuration Ana...

Страница 36: ...l to other tools for example MS Excel further analysis 4 7 Testing protection functionality Each protection function must be tested individually by secondary injection Verify operating levels trip and...

Страница 37: ...rnal test device If the problem remains contact ABB for repair or replacement actions 5 1 2 Identifying runtime errors 1 Check the error origin from IED s internal event list Main menu Monitoring Inte...

Страница 38: ...et cable This communication port is an alternative to the front communication port Check that the LINKUP value is 1 that is the communication is working When the value is 0 there is no communication l...

Страница 39: ...indication message is to be recorded and stated when ordering service Table 3 Internal fault indications Fault indication Additional information Internal Fault Real Time Clock Error Hardware error wi...

Страница 40: ...Error Error in DNP3 communication 5 2 3 Additional indications The additional indication messages do not activate internal fault or warning The messages are listed in the LHMI menu under the event li...

Страница 41: ...heck the current or voltage measurements and their phase information from Main menu Measurements Check that the phase information and phase shift between phases is correct Correct the wiring if needed...

Страница 42: ...s Due to this layers of high resistance may appear on the surface of the contacts Do not determine proper functionality of connectivity or contact resistance by measuring with a regular hand held ohm...

Страница 43: ...y 1 To set the IED to test mode select Main menu Test IED test mode TestMode and set the parameter to On 2 To operate or force the output relay to operate select Main menu Test Forcing Binary output v...

Страница 44: ...when the BO is set to Forced or operated on the LHMI Set the parameter TestMode to Off after completing these tests The Start LED will stop flashing when the relay is no longer in test mode An initia...

Страница 45: ...on Event HMI Human machine interface I O Input output IEC International Electrotechnical Commission IEC 61850 International standard for substation communication and modelling IEC 61850 8 1 A communic...

Страница 46: ...e value Rx Receive Received SAT Site acceptance testing SOTF Switch on to fault TCP IP Transmission Control Protocol Internet Protocol TCS Trip circuit supervision Tx Transmit Transmitted VT Voltage t...

Страница 47: ...39...

Страница 48: ...Contact us ABB Oy Distribution Automation P O Box 699 FI 65101 VAASA Finland Phone 358 10 22 11 Fax 358 10 22 41094 www abb com substationautomation 1MRS756801 A Copyright 2009 ABB All rights reserved...

Отзывы: