
Contents of this chapter ...........................................................................
Checking that the installation is clean and undamaged ......................................
Checking the installation of the inverter station ...............................................
Contents of this chapter ...........................................................................
Routing the cables .................................................................................
Locations of the cable entries ....................................................................
Measuring the insulation resistance of the cabling ...........................................
Connecting AC and DC cabling ..................................................................
DC input cable connection procedure .......................................................
AC output cable connection procedure .....................................................
Connecting alarm and trip signals from MV substation to inverter station .................
Local power enclosure .........................................................................
Connecting auxiliary power supply from inverter station to MV substation ................
Connecting the control cabling ...................................................................
Contents of this chapter ...........................................................................
Tools needed .......................................................................................
Contents of this chapter ...........................................................................
Maintenance intervals .............................................................................
Cleaning the inverter compartment ..............................................................
Replacing the intake air filters and cleaning the sandboxes .................................
Cleaning the exterior surfaces of the inverter station .........................................
Materials .........................................................................................
Procedure .......................................................................................
Lubricating external hinges, locks and seals ...................................................
Materials .........................................................................................
Procedure .......................................................................................
Checking and repairing painted surfaces ......................................................
Materials .........................................................................................
Procedure .......................................................................................
Checking and repairing unpainted, zinc coated surfaces ....................................
Materials .........................................................................................
Procedure .......................................................................................
Checking and cleaning the grounding bars and points .......................................
Materials .........................................................................................
Procedure .......................................................................................
Contents of this chapter ...........................................................................
6 Table of contents
Содержание PVS800-IS
Страница 1: ... ABB CENTRAL INVERTERS PVS800 IS inverter stations 1 645 to 4 156 MW Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 12: ...12 ...
Страница 20: ...20 ...
Страница 24: ...24 ...
Страница 44: ...44 ...
Страница 65: ......
Страница 66: ......
Страница 67: ......