Checking and cleaning the grounding bars and points
■
Materials
•
Steel wool
•
Ensto SR1 joint compound (or similar)
•
42839 Würth Protective Wax Spray (or similar).
■
Procedure
WARNING!
Follow the steps given in section
Safety instructions for the inverter
. Ignoring the instructions can cause physical injury or
death, or damage to the equipment.
1.
Check the condition of grounding bar and grounding cables in the inverter station. If
there is visible corrosion, remove the cables and remove the corrosion with steel wool.
Apply joint compound between the grounding bar and cable terminal joint surfaces.
2.
Change the spring lock washers. Tighten the cables to the nominal torque values (torque
for a M12 bolt is 50 Nm).
Note:
Check the main earthing bar in the MV substation as well to ensure a proper earthing grid.
Follow instructions and guidelines from the supplier of the MV substation.
10
11
12
1
2
3
4
5 6 7
9
8
Earthing to container earthing point
7
Earth cables, 16 mm
2
, 2 pcs
1
Earthing to PVS2 (cable channel)
8
MEB, Main earthing busbar
2
Earthing to PVS1 (cable channel)
9
Earth cables, 120 mm
2
, 4 pcs
3
Container earthing point
10
Earthing to AUX transformer
4
Lead-through plate
11
Earthing to AUX enclosure
5
Earthing to MV station
12
Earthing to MV station (Lead-through plate)
6
52 Maintenance
Содержание PVS800-IS
Страница 1: ... ABB CENTRAL INVERTERS PVS800 IS inverter stations 1 645 to 4 156 MW Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 12: ...12 ...
Страница 20: ...20 ...
Страница 24: ...24 ...
Страница 44: ...44 ...
Страница 65: ......
Страница 66: ......
Страница 67: ......