I N S TA L L AT I O N , O P ER AT I O N S A N D M A I N T EN A N C E M A N UA L
Before beginning the installation, consult all design
drawings provided in the Quality Dossier and
ensure that you have all of the needed equipment
(MCC sections, fastener hardware to connect
sections and shipping split connection hardware)
and make a final check that it is in good condition.
If there is any evidence of damage to the
equipment, contact your ABB representative to
evaluate the condition of the equipment before
proceeding with installation.
Carefully review all supplied project drawings to
familiarize yourself with the layout and
construction of the MCC. After understanding the
dimensional drawings as well as the place where
the MCC will be installed, make the work plan and
verify that it has all the necessary equipment to
carry out the work of the handling for the transport
of the MCC.
Based on the footprint shown on the general
arrangement drawings, make marks on the floor
for all drilled holes necessary to fasten the MCC or
base frame to the floor, and for cable conduits (if
applicable). See the Fastening Sections to a Base
Frame section in this manual
Installation location requirements
The installation must meet the following
qualifications:
• Indoor location protected from moisture and
dramatic temperature changes; for longest
equipment life, install the MCC in an enclosed
room with temperature and humidity control, and
filtered, forced-air ventilation.
• Level the site, preferably including a base frame
that is either embedded in the concrete floor or
rests on a false floor on supports.
—
Installation
• Proper openings in the floor, wall and for cables,
conductors, pipes, bars and ventilation in
accordance with the construction drawings
provided.
• Necessary conduits available to and from the site.
• Convenient alignment with other equipment.a
• Accessibility for maintenance.
• Ambient temperature above -10° C (14° F) but not
exceeding 40°C (104°F) at 85% non-condensing
humidity.
• Sufficient space for future expansions, if required.
To the top
• The minimum distance required from the top of
the unit and the roof is 500mm (20 inches) for
proper installation of the units.
• At least 3048mm (120in) from the floor to the
ceiling above the non-Arc Resistant equipment.
• At least 3658mm (144in) from the floor to the
ceiling above the plenum-less Arc Resistant
equipment.
• For Arc Resistant equipment which requires a
plenum, please contact the factory.
To the sides
• At least 80 mm (3.2 in) between the side of the
sections and the surrounding walls.any adjacent
equipment (ex. other MCC or SWGR).
• At least 1520 mm (5.96 in) between the side of
the MCC end sections and the surrounding walls.