18
M N S - MCC
LO W VO LTAG E M OTO R CO N T R O L C EN T ER
—
18
—
18 Shipping
Receiving
Before unloading, inspect each MCC component
and/or its packaging for evidence of damage
incurred during shipment. If there is any evidence
the equipment has been damaged or mishandled, a
qualified technician should perform a complete
inspection of both the interior and exterior of the
equipment. If there is damage from improper
handling, file a claim for damages at once with the
carrier and notify your ABB representative.
Retain all of the packing material until you are
confident that you have all components and that
they are suitable for installation.
Before shipment, each vertical section is inspected
and marked with its assembly number and location
within the lineup. See 1.8.1. Section and Unit
Numbering of this manual. When the MCC leaves
the factory, a certification of shipment is made
where a photographic report is taken and all the
pieces and spare parts that are sent with the MCC
are registered. Check the equipment received
against the packing list to ensure that all
components were received. Notify your ABB
representative and the carrier at once if there are
any discrepancies between what was ordered and
what was received.
If there will be a delay in installing the MCC, retain
the necessary packing materials to safely store the
MCC. See 2.3.4. Section - Temporary Storage of this
manual.
Unloading and moving MCC components
Unload MCC sections or shipping splits either by
crane or fork-lift and place them on a flat surface.
When moving the sections or shipping splits, keep
them vertical at all times.
MCC sections and shipping splits usually have a
high center of gravity. To improve stability while
moving them to the installation site, leave the
sections or shipping splits secured to the
shipping skid.
Warning:
The MCC includes very heavy
components. To prevent serious injury
or death, or equipment damage, use
only material-handling equipment with
sufficient capacity for the loads involved.
Components should be unloaded and
transported only by qualified operators
and/or installers.
Notice:
Never set the MCC sections on
edge. To prevent deformation, sections
should always rest flat on the floor or
supporting structure.
To keep the MCC structural integrity check that all
doors and panels of the sections are in place and
securely fastened before moving the equipment.
The MCC sections are shipped with the circuit-
breakers, contactors, relays of protection,
implementation of installed controls, so it is
of most importance to take into account for the
handling at the moment of the download of the
carrier's platform, either by open or closed
platform.
Note:
ABB is not responsible for the
damage, after delivery of the MCC or bad
handlings at the time of the download.