![ABB IRB 6730 Скачать руководство пользователя страница 583](http://html1.mh-extra.com/html/abb/irb-6730/irb-6730_product-manual_3670664583.webp)
Note
Action
Torx pan head screw: M6x16 A4-80
Refit the wrist cover and secure with
screws.
3
Tightening torque: 10 Nm.
Foundry Plus:
xx2000000373
Fit all the screws first, then torque tighten.
Refitting cable brackets
Use this procedure to refit the cable brackets.
Note
Action
Remove the lifting accessories.
1
Move the cable harness and DressPack
back to the correct side of the robot.
2
xx1800000042
Refit the axis-3 lower arm metal clamp (the
one closest to the axis-3 gearbox) located
on the inside of the lower arm.
Note
The screw is reached from the outside of
the lower arm!
3
Torx pan head screw: M6x16 A4-80
Refit the metal clamp to the arm house.
4
Tightening torque: 10 Nm.
xx2200001433
Continues on next page
Product manual - IRB 6730
583
3HAC085699-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.9.3 Replacing the axis-3 gearbox
Continued
Содержание IRB 6730
Страница 1: ...ROBOTICS Product manual IRB 6730 ...
Страница 2: ...Trace back information Workspace 23C version a17 Checked in 2023 10 04 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 176: ...This page is intentionally left blank ...
Страница 604: ...This page is intentionally left blank ...
Страница 628: ...This page is intentionally left blank ...
Страница 634: ...This page is intentionally left blank ...
Страница 659: ......