
Refitting the motor
Use these procedures to refit the motor.
Preparations prior to refitting motor
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Cleaning agent: Loctite 7200, Loc-
tite 7063
Remove any old paint or flange sealant residues
or other contamination from the contact surfaces
on both the motor and the mating parts.
Tip
Remove flange sealant residues with Loctite 7200.
Then use Loctite 7063 for cleaning the mating
surface.
2
Flange sealant: Loctite 5800
Apply a continuous bead of flange sealant, 1-2
mm wide, inside of the groove on the motor con-
tact surface.
Note
The purpose of the groove is to catch excess
sealant. No o-ring is used.
3
xx2100000520
Remove the cover, if fitted to the new spare part
motor.
4
Refitting the axis-5 motor
Note
Action
Guide pin, M10x150
Apply two guide pins in opposite holes.
1
3HAC15521-2
CAUTION
Whenever parting/mating motor and gear-
box, the gears may be damaged if excess-
ive force is used.
2
Rotation tool M4: 3HAB7887-1
Apply the rotation tool and use it to rotate
the pinion when mating it into the gear.
3
Continues on next page
432
Product manual - IRB 6730
3HAC085699-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.5 Replacing the axis-5 motor
Continued
Содержание IRB 6730
Страница 1: ...ROBOTICS Product manual IRB 6730 ...
Страница 2: ...Trace back information Workspace 23C version a17 Checked in 2023 10 04 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 176: ...This page is intentionally left blank ...
Страница 604: ...This page is intentionally left blank ...
Страница 628: ...This page is intentionally left blank ...
Страница 634: ...This page is intentionally left blank ...
Страница 659: ......