
Note
Action
Hex socket head cap screw : M10x40 12.9
Gleitmo 603+Geomet 500 (27 pcs ).
xx2100002449
Slide the gearbox into position and fit the
attachment screws and washers.
4
xx2100002446
Remove the guide pins and fit the remain-
ing attachment screws and washers.
5
Tightening torque: see standard torque in
Tighten the attachment screws.
6
Preparations before refitting the upper arm
Note
Action
Wipe clean all contact surfaces.
1
Guide pin, M12x150: 3HAC13056-2
Fit two guide pins in opposite M12 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
2
Always use guide pins in pairs.
xx2100002445
Continues on next page
Product manual - IRB 5720
531
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.3 Replacing the axis-3 gearbox
Continued
Содержание IRB 5710
Страница 1: ...ROBOTICS Product manual IRB 5720 ...
Страница 2: ...Trace back information Workspace 22A version a18 Checked in 2022 03 17 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 186: ...This page is intentionally left blank ...
Страница 580: ...This page is intentionally left blank ...
Страница 604: ...This page is intentionally left blank ...
Страница 609: ......