
Note
Action
Person 1, working at the side hole:
xx2000000416
Remove the cable harness out from the
wrist.
Tip
This step is best performed by two persons
working together:
•
Person 1: Put one hand inside the
side hole and take a hold of the
cable harness.
•
Person 2: Take a hold on the cable
harness inside the wrist.
•
Together: Move the cable harness
past the axis-5 motor and into the
arm tube.
6
Person 2, working at the wrist:
xx1300000746
Person 1, working at side hole:
xx2000000416
Remove the cable harness out of the arm
tube, at the back of the upper arm.
Tip
This step is best performed by two persons
working together:
•
Person 1: Put one hand inside the
side hole and take a hold of the
cable harness.
•
Person 2: Take a hold on the cable
harness at the back of the robot.
•
Together: Move the cable harness
out of the arm tube.
7
Person 2, working at the back:
xx1700001568
Continues on next page
Product manual - IRB 5720
517
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.3 Replacing the axis-3 gearbox
Continued
Содержание IRB 5710
Страница 1: ...ROBOTICS Product manual IRB 5720 ...
Страница 2: ...Trace back information Workspace 22A version a18 Checked in 2022 03 17 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 186: ...This page is intentionally left blank ...
Страница 580: ...This page is intentionally left blank ...
Страница 604: ...This page is intentionally left blank ...
Страница 609: ......