
Preparations before removing the upper arm
Note
Action
Guide pin, M12x150: 3HAC13056-2
Remove two attachment screws in opposite
holes and replace them with guide pins.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
1
Always use guide pins in pairs.
xx2100002444
xx2100002443
Leave one of the remaining attachment
screws fitted, remove the other screws.
2
Removing the upper arm
Note
Action
xx1400002197
Note
Make sure the lift is done completely
leveled! In case of necessary adjustments,
use the shortening loops on the lifting ac-
cessory (chain), and make sure to place
the chain the right way through the loops.
1
Continues on next page
Product manual - IRB 5720
525
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.3 Replacing the axis-3 gearbox
Continued
Содержание IRB 5710
Страница 1: ...ROBOTICS Product manual IRB 5720 ...
Страница 2: ...Trace back information Workspace 22A version a18 Checked in 2022 03 17 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 186: ...This page is intentionally left blank ...
Страница 580: ...This page is intentionally left blank ...
Страница 604: ...This page is intentionally left blank ...
Страница 609: ......